Laserfiche WebLink
City of Everett 00 72 00 - 7 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 7 GENERAL CONDITIONS <br />2.2. DIVISION OF SPECIFICATIONS AND DRAWINGS <br />Specifications and Drawings are divided into groups for convenience. These divisions are not for the <br />purpose of apportioning Work or responsibility for Work among Subcontractors, Suppliers and <br />manufacturers. The Contractor is responsible for all Work shown or described, regardless of location(s) <br />in the Contract Documents. <br />2.3. DISCREPANCIES IN SPECIFICATIONS AND DRAWINGS <br />2.3.1. Errors and Omissions <br />If the Contractor, in the course of the Work, becomes aware of any errors or omissions in the Contract <br />Documents or in the Owner's field work, he or she shall immediately inform the Owner’s Representative <br />in writing. The Owner’s Representative will promptly review the matter and if he or she finds an error or <br />omission has been made, then he or she will determine the corrective actions and advise the Contractor <br />accordingly. If the corrective work associated with an error or omission significantly increases or <br />decreases the amount of Work called for in the Contract, the Owner will issue an appropriate Change <br />Order. After discovery by the Contractor of an error or omission, related work performed by the <br />Contractor shall be done at its risk unless authorized by the Owner’s Representative and approved by the <br />Owner. Omissions from the Drawings or Specifications or the misdescription of details of Work that are <br />manifestly necessary to carry out the intent of the Drawings and Specifications, or that are customarily <br />performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the <br />Work, but they shall be performed as if fully and correctly set forth and described in the Drawings and <br />Specifications. <br />2.3.2. Conflicting Provisions <br />Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br />general drawings. In the event an item of Work is described differently in two or more locations on the <br />Drawings and in the Specifications, the Contractor shall, upon request of the Owner’s Representative, <br />submit in writing to the Owner’s Representative the description upon which the Contractor relied in <br />preparing its Bid or laying out the Work. If the Owner’s Representative directs the Contractor to perform <br />Work in a manner other than that contemplated by the Contractor in preparing its Bid or laying out the <br />Work, Change Order procedures will be followed. In this event, the Contractor shall submit to the <br />Owner’s Representative such supporting information, including bidding or layout documents, as may <br />reasonably be necessary for the Owner’s Representative to determine whether the Contract Sum is <br />increased, decreased or unchanged by the Change Order.