Laserfiche WebLink
City of Everett 00 72 00 - 6 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 6 GENERAL CONDITIONS <br />These parts complement each other in describing the complete Work. Any requirement in one part binds <br />as if stated in all parts. The Contractor shall provide any work or materials clearly implied in the Contract <br />even if the Contract does not mention it specifically. Any inconsistency in the parts of the Contract shall <br />be referred to the Owner’s Representative attention for a determination of the intended requirements. <br />The Work required in one part must be furnished even if not mentioned in other parts of the Contract. If <br />any part of the Contract requires Work that does not include a description for how the Work is to be <br />performed, the Work shall be performed in accordance with standard trade practice(s). For purposes of <br />the Contract, a standard trade practice is one having such regularity of observance in the trade as to justify <br />an expectation that the Contractor will follow or observe the practice in performing the Work. In case of <br />any ambiguity, disagreement or Dispute over interpreting the Contract, the Owner’s Representative’s <br />decision will be final as provided in these General Conditions. <br />Approved Shop Drawings, other Contractor’s Submittals, and the reports and drawings of subsurface and <br />physical conditions are not Contract Documents. <br />2. SPECIFICATIONS AND DRAWINGS <br />2.1. INTERPRETATION OF SPECIFICATIONS AND DRAWINGS <br />The Specifications and Drawings are intended to be explanatory and supportive of each other. Work <br />specified on the Drawings and not in the Specifications, or vice versa, shall be executed as if specified in <br />both. In the event the Work to be done or matters relative thereto are not sufficiently detailed or <br />explained in the Contract Documents, the Contractor shall immediately ask the Owner’s Representative <br />for further explanation and shall comply with such explanation. In the event of doubt or question arising <br />respecting the true meaning of the Specifications or Drawings, Contractor shall refer to the Owner’s <br />Representative for his or her decision. <br />The Specifications may vary in form, format and style. Some specification sections are written in varying <br />degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. <br />Omissions of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as <br />specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by <br />inference. Similar types of provisions may appear in various parts of a section or articles within a part <br />depending on the format of the section. The Contractor shall not take advantage of any variation of form, <br />format or style in making claims for extra Work. <br />The cross referencing of specification sections under the subparagraph heading "Related Sections include <br />but are not necessarily limited to:" and elsewhere within each specification section is provided as an aid <br />and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and <br />shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete <br />Project whether or not the cross referencing is provided in each section or whether or not the cross <br />referencing is complete. <br />Reference to standards, specifications, manuals, or codes of any technical society, organization, or <br />association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean <br />the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids <br />(or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically <br />stated in the Contract Documents. <br />No provision of a standard, specification, manual or code, or an instruction of a Supplier shall be effective <br />to change the duties or responsibilities of Owner, Contractor, or Owner’s Representative, or their <br />Subcontractors, consultants, agents, or employees from those set forth in the Contract Documents. No <br />such provision or instruction shall be effective to assign to Owner, or Owner’s Representative, or their <br />related entities, any duty or authority to supervise or direct the performance of the Work or any duty or <br />authority to undertake responsibility inconsistent with the provisions of the Contract Documents.