My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 9 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 9 GENERAL CONDITIONS <br />2.3.3.4 Unknown Utilities <br />When a utility interferes with the Work and is either (1) not identified on the Drawings or (2) located in a <br />position significantly different from that specified on the Drawings, Contractor shall follow the <br />procedures of ARTICLE 11. DIFFERING SITE CONDITIONS. Interference with the Work is <br />defined as a utility that crosses or projects into the plane of the Work at an elevation between the top and <br />bottom of the Work. If it is necessary to remove, relocate, or temporarily maintain the utility, that work <br />shall be included in a Change Order. The utility owner has the option of doing such work or permitting <br />the work to be performed by the Contractor. In either case, the cost of the work incurred by or charged to <br />the Contractor will be included in a Change Order. <br />2.4. SUBMITTALS <br />Where required by the Contract Documents, the Contractor shall submit information which will enable <br />the Owner’s Representative to advise the Owner whether the Contractor's proposed materials, Equipment <br />or methods of work are in general conformance to the design concept and in compliance with the <br />Drawings and Specifications, such as catalog cuts and shop, working or detail drawings. In its <br />Submittals, the Contractor shall expressly and explicitly notify the Owner’s Representative of any and all <br />deviations from the Specifications. Without express and explicit Notice of a deviation from the Contract <br />requirements, approval of a Submittal does not relieve Contractor from complying with Contract <br />requirements. The Owner’s approval of a Submittal does not constitute a waiver of the Contract <br />requirements. The Owner or Owner’s Representative shall respond to a Submittal within thirty (30) days <br />of receipt. The Owner or Owner’s Representative may extend this time for good cause by notifying the <br />Contractor. The Owner will not be obligated to accept or pay for Work performed by the Contractor that <br />may be affected by materials, Equipment, or methods of work not submitted in a timely manner so that <br />final review can be accomplished before the affected Work is complete. The Owner shall not be <br />responsible for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part by <br />Contractor’s failure to submit required information in sufficient time for review, comment, and <br />correction. Contractor’s failure to submit required information in sufficient time for review, comment <br />and correction shall be deemed a waiver of any and all Contract Claims for adjustment of Contract Sum <br />or Contract Time arising out of, or related to, such a Submittal. Contractor acknowledges and agrees that <br />it may not rely upon receiving the Owner’s response to a Submittal in less than thirty (30) days, unless the <br />Owner explicitly changes this section by a signed Change Order. Requests for information or <br />clarification from the Contractor to the Owner shall be treated as a Submittal. <br />2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br />The Contractor shall keep at the construction site at least one set of Contract Documents and one set of <br />full-size Drawings that shall be available to the Owner’s Representative and Owner. <br />3. OWNER <br />3.1. GENERAL <br />The Owner, and the Owner’s Representative, shall have the authority to act as the sole judge of the Work, <br />Equipment and materials with respect to both quantity and quality as set forth in the Contract. It is <br />expressly stipulated that the Drawings, Specifications and other Contract Documents set forth the <br />requirements as to the nature of the completed Work and do not purport to control the method of <br />performing Work except in those instances where the nature of the completed Work is dependent on the <br />method of performance.
The URL can be used to link to this page
Your browser does not support the video tag.