My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 10 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 10 GENERAL CONDITIONS <br />The Owner has the authority to act, do, perform, and make any all decisions and actions authorized by the <br />Contract Documents, including, but not limited to, Change Orders, progress payments, Contract <br />decisions, acceptability of the Contractor's Work, and early possession. The Owner has the authority to <br />accept or reject requests for progress payments that have been submitted by the Contractor and <br />recommended by the Owner’s Representative. The Owner has the authority to make determinations of <br />the acceptability of the Work. The Owner also has the authority to accept or reject the Owner’s <br />Representative's recommendations regarding retention of defective Work. <br />3.2. OWNER’S REPRESENTATIVE <br />The Owner’s Representative shall be satisfied that all the Work is being done in accordance with the <br />requirements of the Contract. The Contract and Specifications give the Owner’s Representative authority <br />over the administration of the Contract. Whenever it is so provided in this Contract, the decision of the <br />Owner’s Representative shall be final. <br />The Owner’s Representative’s decisions will be final on all questions including but not limited to, unless <br />specifically assigned to an Architect or Engineer, the following: <br />1. Measurement of Work, whether lump sum, Force Account, or unit price; <br />2. Acceptability of rates of progress on the Work; <br />3. Interpretation of Drawings and Specifications with regard to administrative matters; <br />4. Determination as to the existence of changed or differing site conditions; <br />5. Fulfillment of the Contract by the Contractor; <br />6. Payments under the Contract including adjustment and; <br />7. Suspension(s) of Work. <br />If the Contractor fails to respond promptly to the requirements of the Contract or orders from the Owner’s <br />Representative: <br />1. The Owner’s Representative may use the Owner’s resources, other contractors, or other means to <br />accomplish the Work, and <br />2. The Owner will not be obligated to pay the Contractor, and will deduct from the Contractor’s <br />payments, any costs that result when any other means are used to carry out the Contract <br />requirements or Owner’s Representative’s orders. <br />At the Contractor’s risk, the Owner’s Representative may suspend all or part of the Work if: <br />1. The Contractor fails to fulfill Contract terms, to carry out the Owner’s Representative’s orders, or <br />to correct unsafe conditions of any nature; or <br />2. It is in the public interest. <br />The Owner’s Representative and Owner shall have complete access to the Work and to the Site of the <br />Work and to the places where Work is being prepared or where materials, Equipment, and machinery are <br />being obtained for the Work. If requested by the Owner’s Representative or Owner, the Contractor shall <br />provide the assistance necessary for obtaining such access, and shall provide information related to the <br />inspection of construction. Absence of such access or information, as needed, may result in the Owner’s <br />refusal to accept the Work. <br />The Owner’s Representative has the authority to recommend Change Orders, but does not have authority <br />to approve Change Orders. Proposed Change Orders are subject to review and approval by the Owner. <br />No proposed Change Order or any change of Contract Sum or Contract Time is effective or binding upon <br />the Owner unless and until the Mayor or his or her designee signs it, as authorized by City Council or by <br />ordinance.
The URL can be used to link to this page
Your browser does not support the video tag.