My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 13 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 13 GENERAL CONDITIONS <br />At the time of subcontract execution, the Contractor must verify that each of its first tier subcontracts <br />meets the following bidder responsibility criteria (as such criteria may be amended or supplemented by <br />statute): <br />1. At the time of subcontract Bid Submittal, have a certificate of registration in compliance with <br />Chapter 18.27 RCW; <br />2. Have a current state unified business identifier number; <br />3. If applicable, have: <br />a. Industrial insurance coverage for the Subcontractor’s employees working in Washington as <br />required in Title 51 RCW; <br />b. An employment security department number as required in Title 50 RCW; <br />c. A state excise tax registration number as required in Title 82 RCW; <br />d. An electrical contractor license, if required by Chapter 19.28 RCW; <br />e. An elevator contractor license, if required by Chapter 70.87 RCW. <br />4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or <br />39.12.065(3). <br />5. If bidding on a public works project subject to the apprenticeship utilization requirements in <br />RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship <br />and training council for working apprentices out of ratio, without appropriate supervision, or <br />outside their approved work processes as outlined in their standards of apprenticeship under <br />chapter 49.04 RCW for the one-year period immediately preceding the date of the bid <br />solicitation; <br />6. Within the three-year period immediately preceding the date of the bid solicitation, not have been <br />determined by a final and binding citation and notice of assessment issued by the department of <br />labor and industries or through a civil judgment entered by a court of limited or general <br />jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter <br />49.46, 49.48, or 49.52 RCW; and <br />7. Have received training on the requirements related to public works and prevailing wage under in <br />accordance with the requirements of RCW 39.04.350(f), or demonstrate exemption from such <br />requirements. <br />The Contract Documents shall apply to Subcontractors and Suppliers as if each had signed the Contract <br />with the Owner. Contractor shall include the provisions of these Contract Documents or a “flow down” <br />clause in each contract with Subcontractors and Suppliers. <br />4.4. RESPONSIBILITIES <br />4.4.1. Subcontractors, Manufacturers and Suppliers <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of Subcontractors, <br />manufacturers, Suppliers and their employees. <br />4.4.2. Contractor's Employees <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of its employees. <br />Workers shall have sufficient knowledge, skill and experience to perform properly the Work assigned to <br />them.
The URL can be used to link to this page
Your browser does not support the video tag.