My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 14 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 14 GENERAL CONDITIONS <br />4.4.3. Payment for Labor and Materials <br />The Contractor shall pay and require its Subcontractors to pay any and all accounts for labor including <br />Worker's Compensation premiums, State Unemployment and Federal Social Security payments and other <br />wage and salary deductions required by law. The Contractor also shall pay and cause its Subcontractors <br />to pay any and all accounts for services, Equipment, and materials used by him and its Subcontractors <br />during the performance of Work under this Contract. The Contractor shall pay such accounts as they <br />become due and payable. If requested by the Owner, the Contractor shall promptly furnish proof of <br />payment of such accounts to the Owner. <br />4.4.4. Attention to Work <br />The Contractor, acting through its representative, shall give personal attention to and shall manage the <br />Work so that it shall be prosecuted faithfully and completed under the Project schedule. When its <br />representative is not personally present at the Project Site, its designated alternate shall be available and <br />shall have the authority to act in matters relating to this Contract. <br />4.4.5. Safety <br />The Contractor alone shall be responsible for safety on the job Site, including, but not limited to, the <br />safety of its and its Subcontractor's employees. The Contractor shall maintain the Project Site and <br />perform the Work in a manner which meets the Owner's responsibility under statutory and common law <br />for the provision of a safe place to work. <br />4.4.6. Threats, Intimidation and Harassment Forbidden <br />Contractor shall not allow its employees, its Subcontractors, its Subcontractors’ employees, or any other <br />agents to threaten bodily injury or property damage, to intimidate or attempt to intimidate any person, or <br />to assault or physically harass any person. Forbidden conduct includes, but is not limited to, threatening, <br />appearing, or actually doing any of the following: pushing, shoving, striking, physically blocking a person <br />or a person’s vehicle, vandalism, malicious mischief, or any other act that a reasonable person would <br />understand be intended to intimidate, cause personal injury, or cause property damage. Contractor shall <br />remove from the job site any person reasonably under its control or direction who the Contractor or <br />Owner reasonably believes violated this section. The lack of a request from the Owner or Owner’s <br />Representative to the Contractor to remove someone from the job Site does not relieve the Contractor <br />from its obligation to remove someone. <br />4.4.7. Weapons Forbidden <br />Contractor shall not allow its employees, its Subcontractors, its Subcontractors’ employees, or any other <br />agents or representatives to carry or possess, openly or concealed, explosives or weapons on the job Site, <br />except: (a) such explosives are as reasonably required for performance of the Work, such as those <br />necessary for blasting or demolition work called for by the Contract Documents or (b) commissioned law <br />enforcement officers or security personnel under authority of their commission. A weapon is any object, <br />instrument or chemical which is (1) designed in such a manner to inflict harm or injury to another person; <br />or (2) any item used in a manner threatening harm or injury to another person. Weapons include, but are <br />not limited to, firearms, dangerous knives, dangerous chemicals, tear gas, martial arts weapons, <br />blackjacks or other weapons. Further, weapons should include those delineated in EMC Chapter 10.78. b. <br />Possession of mace, pepper spray or the like for defensive purposes is not a violation of this policy. <br />Contractor shall remove from the job Site any person reasonably under its control or direction who the <br />Contractor or Owner reasonably believes violated this section. The lack of a request from the Owner or <br />Owner’s Representative to the Contractor to remove someone from the job Site does not relieve the <br />Contractor from its obligation to remove someone.
The URL can be used to link to this page
Your browser does not support the video tag.