My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Port Gardner Storage Facility - Facility Construction Package Table of Contents <br />Project No. 157889 8 <br /> <br />DIVISION 40 PROCESS INTERCONNECTIONS Engineer of <br />Record <br />40 61 96.08 PROCESS CONTROL DESCRIPTION – LIFT STATION 46 C. Bliesner <br />40 61 96.09 PROCESS CONTROL DESCRIPTION – INFLUENT BUILDING C. Bliesner <br />40 61 96.10 PROCESS CONTROL DESCRIPTION – OMES BUILDING AND <br />ELECTRICAL <br />C. Bliesner <br />40 63 43 PROGRAMMABLE LOGIC CONTROLLERS AND OPERATOR <br />INTERFACE TERMINALS <br />C. Bliesner <br />40 66 33 METALLIC AND FIBER-OPTIC COMMUNICATION CABLING AND <br />CONNECTORS <br />C. Bliesner <br />40 67 00 CONTROL SYSTEM EQUIPMENT AND PANELS AND RACKS C. Bliesner <br />40 68 00 PROCESS CONTROL SOFTWARE C. Bliesner <br />40 71 00 FLOW MEASUREMENT C. Bliesner <br />40 72 00 LEVEL MEASUREMENT C. Bliesner <br />40 73 00 PRESSURE, STRAIN AND FORCE MEASUREMENT C. Bliesner <br />40 76 00 PROCESS GAS ANALYTICAL MEASUREMENT C. Bliesner <br />40 79 00 MISCELLANEOUS INSTRUMENTS, CALIBRATION EQUIPMENT, <br />INSTRUMENT VALVES, AND FITTINGS <br />C. Bliesner <br /> <br />DIVISION 41 MATERIAL PROCESSING AND HANDLING EQUIPMENT Engineer of <br />Record <br />41 12 13.19 BELT BULK MATERIAL CONVEYORS C. Biesemeyer <br />41 22 13.13 BRIDGE CRANES R. Long <br /> <br />DIVISION 43 PROCESS GAS AND LIQUID HANDLING PURIFICATION AND <br />STORAGE EQUIPMENT <br />Engineer of <br />Record <br />43 05 11 GENERAL REQUIREMENTS FOR EQUIPMENT R. Long <br />43 05 13 RIGID EQUIPMENT MOUNTS R. Long <br />43 05 21 COMMON MOTOR REQUIREMENTS FOR EQUIPMENT R. Long <br />43 11 19.13 CENTRIFUGAL FRP FANS C. Biesemeyer <br />43 15 43 MIST/GREASE ELIMINATORS R. Long <br />43 16 23.02 BLADDER-TYPE SURGE TANKS C. Gish <br />43 16 23.03 DIPPING TUBE STYLE SURGE TANKS C. Gish <br />43 23 03 GENERAL REQUIREMENTS FOR CENTRIFUGAL AND AXIAL-FLOW <br />PUMPING EQUIPMENT <br />R. Long <br />43 23 80.15 SUBMERSIBLE WASTEWATER PUMPS – VARIABLE SPEED R. Long <br /> <br />DIVISION 44 POLLUTION AND WASTE CONTROL EQUIPMENT Engineer of <br />Record <br />44 31 16 ACTIVATED CARBON ADSORPTION ODOR CONTROL MEDIA AND <br />VESSEL <br />C. Biesemeyer <br /> <br />DIVISION 46 WATER AND WASTEWATER EQUIPMENT Engineer of <br />Record <br />46 21 13 MULTI-RAKE BAR SCREENS C. Biesemeyer <br />46 46 16 AUTOMATIC FLUSHING GATES M. Bray
The URL can be used to link to this page
Your browser does not support the video tag.