Laserfiche WebLink
<br />Port Gardner Storage Facility - Facility Construction Package Table of Contents <br />Project No. 157889 7 <br /> <br />DIVISION 40 PROCESS INTERCONNECTIONS Engineer of <br />Record <br />40 05 31.17 PVC GRAVITY SEWER PIPE AND DWV (DRAIN, WASTE, AND VENT) <br />PIPE AND FITTINGS <br />C. Biesemeyer <br />40 05 33.13 HIGH DENSITY POLYETHYLENE PIPE – SOLID WALL C. Biesemeyer <br />40 05 45 PIPING SYSTEM IDENTIFICATION M. Bray <br />40 05 57.13 MANUAL ACTUATORS M. Bray <br />40 05 57.23 ELECTRIC MOTOR ACTUATORS M. Bray <br />40 05 59.16 STOP GATES M. Bray <br />40 05 59.23 FABRICATED SLIDE GATES C. Gish <br />40 05 60 VALVES M. Bray <br />40 05 61.05 GATE VALVE, AWWA C509, NON-RISING STEM, SQUARE NUT M. Bray <br />40 05 61.43 KNIFE GATE VALVES M. Bray <br />40 05 62.01 PLUG VALVE, AWWA C517 STANDARD PORT M. Bray <br />40 05 62.03 PLUG VALVE, THREE-WAY M. Bray <br />40 05 63.02 BALL VALVE, BRONZE/BRASS, FULL PORT M. Bray <br />40 05 64.03 BUTTERFLY VALVE, HIGH-PERFORMANCE SOFT-SEATED M. Bray <br />40 05 64.13 BUTTERFLY VALVE, PVC BODY M. Bray <br />40 05 64.91 BUTTERFLY DAMPER, FRP M. Bray <br />40 05 64.93 FLUOROPOLYMER LINED STAINLESS STEEL DAMPER M. Bray <br />40 05 65.31 DUCTILE IRON, ELASTOMERIC FLAP CHECK VALVES M. Bray <br />40 05 66.01 GLOBE VALVE, BRONZE M. Bray <br />40 05 74.23 PINCH VALVE, CLOSED BODY M. Bray <br />40 05 78.23 AIR/VACUUM VALVES FOR WASTEWATER SERVICE C. Gish <br />40 05 79 AIR/VACUUM VALVES FOR STORMWATER OUTFALL J. Riegel <br />40 05 79.23 AIR/VACUUM VALVES FOR STORMWATER AND COMBINED SEWER J. Riegel <br />40 05 80 BACKFLOW PREVENTERS FOR WATER SERVICE J. Riegel <br />40 06 20.13 POWER ACTUATED VALVE AND GATE SCHEDULE FOR PROCESS <br />SERVICES <br />M. Bray <br />40 06 70 SCHEDULES FOR INSTRUMENTATION OF PROCESS SYSTEMS C. Bliesner <br />40 13 16 FLUOROPOLYMER LINED STAINLESS STEEL DUCTWORK C. Biesemeyer <br />40 41 00 PROCESS PIPING ELECTRICAL RESISTANCE HEAT TRACING C. Biesemeyer <br />40 42 00 INSULATION FOR EXPOSED PIPING AND EQUIPMENT M. Bray <br />40 50 36.71 FIBERGLASS-REINFORCED PLASTIC PROCESS PIPE REPAIR M. Bray <br />40 61 13 PROCESS CONTROL SYSTEM GENERAL PROVISIONS C. Bliesner <br />40 61 21 PROCESS CONTROL SYSTEM TESTING C. Bliesner <br />40 61 93 PROCESS CONTROL SYSTEM INPUT/OUTPUT LIST C. Bliesner <br />40 61 96 PROCESS CONTROL DESCRIPTIONS C. Bliesner <br />40 61 96.01 PROCESS CONTROL DESCRIPTION – SITE C. Bliesner <br />40 61 96.02 PROCESS CONTROL DESCRIPTION – DEBRIS REMOVAL C. Bliesner <br />40 61 96.03 PROCESS CONTROL DESCRIPTION – PRIMARY STORAGE C. Bliesner <br />40 61 96.04 PROCESS CONTROL DESCRIPTION – SECONDARY STORAGE AND <br />DISTRIBUTION STRUCTURE <br />C. Bliesner <br />40 61 96.05 PROCESS CONTROL DESCRIPTION – STORMWATER DIVERSION <br />AND TREATMENT <br />C. Bliesner <br />40 61 96.06 PROCESS CONTROL DESCRIPTION – EFFLUENT PUMP STATION C. Bliesner <br />40 61 96.07 PROCESS CONTROL DESCRIPTION – DEBRIS REMOVAL ODOR <br />CONTROL <br />C. Bliesner