My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 43 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 43 GENERAL CONDITIONS <br />9.6.6. For Contractor Markup on Subcontractor’s Work. <br />When Work is performed on a Force Account basis by one or more approved Subcontractors, by lower- <br />tier Subcontractors or Suppliers, or through invoice by firm(s) acting in the manner of a Subcontractor, <br />the Contractor will be allowed an additional markup, from the table below, applied to the costs computed <br />for Work done by each Subcontractor through 9.6.1, 9.6.2, 9.6.3, and 9.6.4, to compensate for all <br />administrative costs, including project Overhead, general company Overhead, profit, bonding, insurance, <br />Business & Occupation tax, and any other costs incurred. <br />A firm may be considered to be acting as a Subcontractor when the Owner’s Representative observes one <br />or more of the following characteristics: <br />1. The person in charge of the firm’s activities takes an active role in managing the overall project, <br />including extensive coordination, interpretation of Drawings, interaction with the Owner or <br />management of a complex and interrelated operation. <br />2. Rented equipment is provided fueled, operated and maintained by the firm. Operators of rented <br />equipment are supervised directly by the firm’s representative. There is a little interaction <br />between the Contractor and the employees of the firm. <br />3. The firm appears to be holding the risk of performance and quality of the Work. <br />4. The firm appears to be responsible for liability arising from the Work. <br />Markups on Work Performed by Subcontractor(s): <br />On amounts paid for Work performed <br />by each Subcontractor on each <br />Force Account and calculated <br />through 9.6.1-4 <br /> <br /> <br />Up to $25,0000 <br /> <br /> <br />12% <br />On amounts greater than $25,000 up to $100,000 10% <br />On amounts greater than $100,000 7% <br />The amounts and markup rates shall be calculated separately for each Subcontractor on each Force <br />Account item established. <br />The payments provided above shall be full payment for all Work done on a Force Account basis. The <br />calculated payment shall cover all expenses of every nature, kind and description, including those listed <br />above and any others incurred on the Work being paid through Force Account. Nothing in this provision <br />shall preclude the Contractor from seeking an extension of time or time-related damages to unchanged <br />Work arising as a result of Force Account Work. The amount and costs of any work to be paid by Force <br />Account shall be computed by the Owner’s Representative and the result shall be final as provided in 3.2 <br />OWNER’S REPRESENTATIVE. <br />An item that has been bid at a unit price or lump sum in the Bid will not be paid as Force Account unless <br />a change, as defined in ARTICLE 6. CHANGES, has occurred and the provisions require a payment <br />adjustment. Items which are included in the Bid as Force Account or which are added by change order as <br />Force Account may, by agreement of the parties at any time, be converted to agreed unit prices or lump <br />sums applicable to the remaining Work. <br />9.7. RETAINAGE <br />Pursuant to RCW Chap. 60.28, a sum of five percent (5%) of the monies earned by the Contractor will be <br />retained from progress estimates. In addition to protecting the interests of those identified in RCW Chap. <br />60.28, such retainage shall be used as a trust fund for the protection of the Owner. <br />At the option of the Contractor; monies retained under the provisions of RCW 60.28 shall be: <br />1. Retained in a fund by the Owner, or
The URL can be used to link to this page
Your browser does not support the video tag.