My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 11 13 - 1 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 11 13 - 1 ADVERTISEMENT FOR BIDS <br />SECTION 00 11 13 - ADVERTISEMENT FOR BIDS <br /> <br />Notice is hereby given that sealed bids for the Port Gardner Storage Facility <br />Construction Package WO# UP-3525 will be received at the City Clerk, 1st Floor Everett <br />Municipal Building, 2930 Wetmore, Everett, WA, 98201, until 2:00 p.m. on Tuesday, <br />October 21, 2025. At the appointed time, all bids will be opened and read aloud publicly <br />via live streaming, or bidders may attend the bid opening in person at 2930 Wetmore Ave, <br />Suite 9E, Everett, WA 98201. The link to view the live streaming bid opening can be found <br />at: https://everettwa.gov/319/Procurement. The engineer’s estimate for this Project is <br />$108,840,000, including sales tax. <br />Project Description <br /> <br />The City of Everett Port Gardner Water Quality Program serves to improve water quality in the <br />Possession Sound and Port Gardner Bay by reducing combined sewer overflows and providing <br />regional stormwater treatment for more than 200 acres of urban watershed. Phase 1 of the <br />program includes the design of the Port Gardner Storage Facility (PGSF). The City of Everett <br />acquired the Kimberly-Clark Wastewater Treatment Plant in 2019 to repurpose the infrastructure <br />into the PGSF. <br />The PGSF will provide temporary combined sewer storage, reducing CSOs at the City’s four <br />remaining uncontrolled CSO discharge points to meet the Washington State Department of <br />Ecology executed Agreed Order number 11638.This facility will also provide stormwater treatment <br />for separated stormwater drainage basins with conveyance to the City’s deepwater outfall and <br />local stormwater conveyance to the Everett Water Pollution Control Facility. <br />Construction of the PGSF involves retrofit of the project site through installation of combined <br />sewer and stormwater infrastructure. This includes, but is not limited to, buried conveyance <br />pipelines, construction of two green field pump stations, rehabilitation of the existing aeration <br />basins and secondary clarifiers, installation of a ground stabilizing buttress wall, pre-cast and cast <br />in place vaults, architectural improvements made to existing buildings, installation of electrical <br />systems, instrumentation and controls, and pile supports for new and existing structures. This <br />work also involves all facility commissioning and start-up activities. Section 01 11 00 Summary of <br />Work provides a detailed narrative of the project scope of work. Construction of the PGSF is <br />estimated to commence in winter 2025 and the facility is scheduled to be substantially complete <br />by December 31, 2027, to be in compliance with the Agreed Order 11638 deadline. <br />Pre-bid meetings are scheduled at 10:00 a.m., Tuesday, 10/7/25 and at 2:00 p.m., Thursday, <br />10/9/25on site at 2200 W Marine View Dr., Everett WA 98201. Attendance to one pre-bid <br />meeting is mandatory. A Bid received from a Bidder who did not attend one pre-bid <br />meeting and sign the sign-in sheet will be found not responsible and the bid will be <br />rejected. Bidders who attended one of the pre-bid meetings previously held for the project <br />in June 2025 and who signed the sign-in sheet will be found to have met the pre-bid <br />meeting attendance requirement and are not required to attend the pre-bid meetings <br />scheduled on 10/7/25 or 10/9/25. Any questions and/or answers to that may affect the Bid will <br />be included in an addendum to the bid documents and sent to all the plan holders. <br />
The URL can be used to link to this page
Your browser does not support the video tag.