My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 73 43 - 2 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br />00 73 43 - 2 WAGE RATE REQUIREMENTS <br />E. Post the prevailing rate of wage statement in a location readily visible to workers at the <br />job site, or as allowed by RCW 39.12.020. The “Statement of Intent to Pay Prevailing <br />Wages” shall include: <br />1. Contractor’s registration certificate number and <br />2. Prevailing rate of wage for each classification of workers entitled to prevailing <br />wages under RCW 36.12.020 and the estimated number of workers in each <br />classification. <br />END OF SECTION 00 73 43
The URL can be used to link to this page
Your browser does not support the video tag.