My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 73 73 - 1 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br />00 73 73 - 1 APPRENTICE UTILIZATION <br />SECTION 00 73 73 - APPRENTICE UTILIZATION <br />This Contract includes an Apprentice Utilization Requirement. Fifteen percent or more of <br />project Labor Hours shall be performed by Apprentices unless Good Faith Efforts are <br />accepted. Apprentice Utilization will be determined using the Department of Labor and <br />Industries (L&I) online Prevailing Wage Intent & Affidavit (PWIA) system. <br />Definitions <br />For the purposes of this specification the following definitions apply: <br />1. Apprentice is a person enrolled in a State-approved Apprenticeship Training Program. <br />2. Apprentice Utilization is the apprentice labor hours, on the project, expressed as a <br />percentage of project Labor Hours based on certified payrolls or the affidavits of wages <br />paid, whichever is least. The percentage is not rounded up. <br />3. Apprentice Utilization Requirement is the minimum percentage of apprentice labor <br />hours required by the Contract. <br />4. Good Faith Effort(s) (GFE) describes the Contractor’s efforts to meet the Apprentice <br />Utilization Requirement including but not limited to the specific steps as described <br />elsewhere in this specification. <br />5. Labor Hours are the total hours performed by all workers receiving an hourly wage <br />who are subject to prevailing wage requirements for work performed on the Contract <br />as defined by RCW 39.04.310. Labor Hours are determined based on the scope of <br />work performed by the individuals, rather than the title of their occupations in <br />accordance with WAC 296-127. <br />6. State-approved Apprenticeship Training Program is an apprenticeship training <br />program approved by the Washington State Apprenticeship Council. <br />7. Apprentice Wage Rates are the applicable wage rates that are to be paid for an <br />apprentice registered in a training program, separate from Journey Level rates, as set <br />by the Washington State Apprenticeship Training Council and Washington State <br />Department of Labor and Industries (L&I). <br />Electronic Reporting <br />The Contractor shall use the PWIA System to submit the “Apprentice Utilization Plan”. <br />Reporting instructions are available in the application. <br />Apprentice Utilization Plan <br />The Contractor shall submit an “Apprentice Utilization Plan” by filling out the Apprentice <br />Utilization Plan Form (WSDOT Form 424-004 or other form approved by the Owner) within 30 <br />calendar days of Contract execution, however no later than the preconstruction meeting, <br />demonstrating how and when the Contractor intends to achieve the Apprentice Utilization <br />Requirement. The Plan shall be in sufficient detail for the Engineer or other Owner <br />representative to track the Contractor’s progress in meeting the utilization requirements. An <br />Apprentice Utilization Plan shall be updated and resubmitted as the Work progresses or when <br />requested by the Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.