My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 21 13 - 6 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 21 13 - 6 INSTRUCTIONS TO BIDDERS <br />Bidders are advised to examine and to be thoroughly familiar with such <br />requirements. No claim for additional compensation will be allowed that is based <br />upon a lack of knowledge of these requirements or a failure to include adequate <br />increases in such wages over the term of this Contract in the Bidder's Bid. <br />1-02.4(1)C Apprentice Utilization <br />If this Project is subject to apprentice utilization requirements, then such <br />requirements will be contained in SECTION 00 7373 APPRENTICE UTILIZATION. <br />If there is no SECTION 00 7373 APPRENTICE UTILIZATION in the bid package, <br />then the Project is not subject to apprentice utilization requirements. Bidders are <br />advised to examine and to be thoroughly familiar with such requirements. No <br />claim for additional compensation will be allowed that is based upon a lack of <br />knowledge of these requirements. <br />1-02.4(2) Subsurface Information <br />If the City has made subsurface investigation of the site of the proposed Work, the <br />boring log data and soil sample test data accumulated by the City will be made <br />available for inspection by the Bidders. The boring logs and soil sample test data <br />shall NOT be considered as part of the Contract and are not Contract Documents. <br />In addition, the City makes no representation or warranty expressed or implied that: <br />1. The Bidders’ interpretations from the boring logs are correct, <br />2. Moisture conditions and indicated water tables will not vary from those <br />found at the time the borings were made, and <br />3. The ground at the location of the borings has not been physically <br />disturbed or altered after the boring was made. <br />The City specifically makes no representations, guarantees, or warranties as to <br />the condition, materials, or proportions of the materials between the specific <br />borings regardless of any subsurface information the City may make available to <br />the prospective Bidders. <br />The boring log data and soil sample data, if any, are included in the bid documents. <br />If there is a geotechnical report made by the City, Bidder may contact the Project <br />Manager to arrange to view the geotechnical report. <br />1-02.5 Bid Form <br />The City reserves the right to arrange the bid forms with alternates and additives, if such <br />be to the advantage of the City. The Bidder shall bid on all alternates and additives set <br />forth in the Bid Form unless otherwise specified. <br />1-02.6 Preparation of Bid <br />Bids shall be submitted on the forms provided by the City and found in the Contract <br />Documents. All blank spaces in the Bid form shall be legibly filled in using a non-erasable <br />medium. Do not qualify Bids, since this will automatically be cause for rejection of the Bid. <br />A Bid will be rejected if the authorized Bid form furnished by the City is not used. <br />Bid prices shall include everything necessary for the completion of the Work including, but <br />not limited to, providing the materials, equipment, tools, plant and other facilities, and the <br />management, superintendence, labor, and all necessary testing services.
The URL can be used to link to this page
Your browser does not support the video tag.