Laserfiche WebLink
City of Everett 00 21 13 - 15 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 21 13 - 15 INSTRUCTIONS TO BIDDERS <br />5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit <br />of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to <br />the Subcontractor shall be submitted to the Employment Standards Division, State <br />Department of Labor and Industries, Olympia, Washington. If the prime contract <br />is over $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 <br />(Affidavit of Wages Paid EHB 2805 Addendum). <br />6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br />WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll <br />Form WH347 may use State of Compliance found on the back of the form. <br />7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). Contractors, <br />Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall <br />attach the Statement of Compliance Form WH348 to each payroll. <br />8. Approval of Subcontractors: Contractors shall request approval of Subcontractors <br />on a form provided by the City prior to their working on the Site. <br />9. Construction Progress Schedule: To be submitted as required by Section 00 7200, <br />Part 5 “Progress and Completion”, of the Contract Documents by the Contractor <br />within ten calendar days, or such time as determined by the City, after the date of <br />receipt of Notice to Proceed. <br />10. Traffic Control Plan: Standard Traffic Control Plans are included in the City’s <br />Design and Construction Standards. If, and to the extent, such plans are not <br />sufficient, complete or adequate to support the Bidder’s planned means and <br />methods of performing the Work, the Bidder must develop an adequate, complete <br />and sufficient traffic control plan at its cost, that shall be submitted for the City’s <br />approval prior to construction. Deviation from the Standard Plans must be <br />submitted by the Contractor and approved by the City prior to construction. <br />11. Disposal Sites: Provide the City with the location of all disposal sites to be used, <br />and also provide copies of the permits and approvals for such disposal sites. The <br />Contractor shall provide the City with copies of all permits for disposal and storage <br />of surplus materials within ten calendar days after award of the Contract. <br /> <br />END OF SECTION 00 21 13