My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 41 13 - 2 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br />00 41 13 - 2 BID FORM <br />ITEM <br />NO.DESCRIPTION UNIT <br />ESTIMATED <br />QUANTITY UNIT PRICE <br />CONTRACT <br />PRICE <br />1.Mobilization and <br />Demobilization a <br />Lump <br />Sum 1 N/A $_______.___ <br />2.Temporary erosion and <br />sediment control <br />Lump <br />Sum 1 N/A $_______.___ <br />3.Buttress Wall Ground <br />Improvement <br />Lump <br />Sum 1 N/A $_______.___ <br />4. <br />Hazardous waste <br />materials removal and <br />disposal <br />Lump <br />Sum 1 N/A $_______.___ <br />5.Contaminated soil <br />removal and disposal Ton 1,090 $_____.___$_______.___ <br />6. <br />Grading, Paving, <br />Fencing, and General <br />Site Improvements Area <br />10 <br />Lump <br />Sum 1 N/A $_______.___ <br />7.Combined sewer <br />conveyance Area 10 <br />Lump <br />Sum 1 N/A $_______.___ <br />8. <br />Combined sewer influent, <br />screening, and storage <br />Areas 15, 20, 25 and 30 <br />Lump <br />Sum 1 N/A $_______.___ <br />9.Stormwater conveyance <br />Area 10 b <br />Lump <br />Sum 1 N/A $_______.___ <br />10. <br />Stormwater diversion and <br />treatment Area 40 and <br />stormwater equalization <br />Area 35 b <br />Lump <br />Sum 1 N/A $_______.___ <br />11.Stormwater Treatment <br />Equipment Area 40 b <br />Lump <br />Sum <br />Equipment <br />for 2 of the 8 <br />cells <br />$_______.___$_______.___ <br />12. <br />Stormwater and <br />combined sewer storage <br />facility Areas 50 and 55 b <br />Lump <br />Sum 1 N/A $_______.___ <br />13.Effluent Pump Station <br />Area 60 b <br />Lump <br />Sum 1 N/A $_______.___ <br />14.Site Stormwater Pump <br />Station b <br />Lump <br />Sum 1 N/A $_______.___ <br />15.Lift Station 46 Lump <br />Sum 1 N/A $_______.___ <br />16.General use facilities <br />Areas 06 and 70 <br />Lump <br />Sum 1 N/A $_______.___
The URL can be used to link to this page
Your browser does not support the video tag.