My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 41 13 - 3 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br />00 41 13 - 3 BID FORM <br />ITEM <br />NO.DESCRIPTION UNIT <br />ESTIMATED <br />QUANTITY UNIT PRICE <br />CONTRACT <br />PRICE <br />17.Area 30 Guardrail <br />Repairs <br />Lump <br />Sum 1 N/A $_______.___ <br />18.Guardrail Replacement LF 300 $_____.___$_______.___ <br />19.Area 30 coatings <br />Per <br />Area <br />30 <br />Cell <br />6 $_____.___$_______.___ <br />20. <br />Mobilization and <br />Demobilization for 18” <br />Steel Piles <br />Lump <br />Sum 1 N/A $_______.___ <br />21.18” Test Steel Piles Lump <br />Sum 1 N/A $_______.___ <br />22.Furnish 18” Permanent <br />Piles LF 7,000 $_____.___$_______.___ <br />23.Drive 18” Permanent <br />Piles LF 7,000 $_____.___$_______.___ <br />24. <br />Mobilization and <br />Demobilization for Drilled <br />Micropiles <br />Lump <br />Sum 1 N/A $_______.___ <br />25.Test Drilled Micropiles Lump <br />Sum 1 N/A $_______.___ <br />26. <br />Furnish Materials and <br />Equipment for Drilled <br />Micropiles <br />LF 2,250 $_____.___$_______.___ <br />27.Construct Drilled <br />Micropiles LF 2,250 $_____.___$_______.___ <br />28. <br />Mobilization and <br />Demobilization for Steel <br />Sheet Piles <br />Lump <br />Sum 1 N/A $_______.___ <br />29.Steel Sheet Piles Lump <br />Sum 1 N/A $_______.___ <br />30.Allowance for Concrete <br />Repairs <br />Force <br />Accou <br />nt <br />1 $200,000.00 $200,000.00 <br />31.CCTV Pipe Inspections LF 2,420 $_____.___$_______.___ <br />32.Vibration and Settlement <br />Monitoring <br />Lump <br />Sum 1 N/A $_______.___ <br />33.Trench safety system Lump <br />Sum 1 N/A $_______.___
The URL can be used to link to this page
Your browser does not support the video tag.