My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 41 13 - 5 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br />00 41 13 - 5 BID FORM <br />ALTERNATE BID ITEM SCHEDULE <br />The following alternate bid items are an integral part of this proposal, and to be responsive, the <br />bidder shall quote for the Base Bid, and also for the following alternate bid items: <br />ITEM DESCRIPTION UNITS ESTIMATED <br />QUANTITY <br />UNIT BID <br />PRICE <br />TOTAL BID <br />PRICE <br />A1.Area 30 Guardrail <br />Replacement <br />Lump Sum <br />1 N/A $_______.___ <br />SUBTOTAL PRICE $ <br />9.9% WA STATE SALES TAX FOR ITEM A1 $ <br />ADDITIVE OR DEDUCTIVE BID $ <br />The amount for the alternate bid item shall be the differential price between the cost <br />included in the base bid (“Area 30 Guardrail Repairs”) and the cost to provide the <br />alternate bid item. <br />BASIS OF AWARD <br />The low bid shall be the low aggregate amount for the base bid plus the alternate bid item(s) if <br />selected by Owner. Owner will elect alternat bid item(s) sequentially as listed based on funds <br />available and the best interest of the project as determined by Owner. Bidders should be aware <br />that there could be a different order of bidders depending on which, if any, alternate bid item(s) are <br />selected. <br />1.3 ACCEPTANCE <br />A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid <br />closing date. <br />B. If this Bid is accepted by the Owner within the time period stated above, we will: <br />1. Execute the Agreement within 14 days of receipt of Notice of Award. <br />2. Furnish the required 100% payment and 100% performance bonds within 14 <br />calendar days of receipt of Notice of Award in the form described in Contract <br />Documents. <br />3. Submit to the City in pdf format within 14 days of receipt of Notice of Award the <br />certificate of insurance and additional insured endorsements in accordance with <br />the Contract Documents. <br />4. Commence Work within seven calendar days after receipt of Notice to Proceed.
The URL can be used to link to this page
Your browser does not support the video tag.