Laserfiche WebLink
City of Everett 00 41 13 - 4 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br />00 41 13 - 4 BID FORM <br />ITEM <br />NO.DESCRIPTION UNIT <br />ESTIMATED <br />QUANTITY UNIT PRICE <br />CONTRACT <br />PRICE <br />34.Systems Integrator Lump <br />Sum 1 N/A $_______.___ <br />35.As-built documentation <br />and O&M manual <br />Lump <br />Sum 1 $60,000.00 $60,000.00 <br />36.Force Account <br /> (Section 00 72 00)-N/A N/A $2,500,000 <br />37.Apprenticeship Incentive Lump <br />Sum 1 $5,000.00 $5,000.00 <br />38. <br />Groundwater <br />Dewatering, Treatment, <br />and Disposal <br />Force <br />Accou <br />nt <br />1 N/A $3,500,000 <br />SUBTOTAL $______.___ <br />Washington State Sales Tax <br />@ 9.9%$______.___ <br />TOTAL BID $______.___ <br />a. Mobilization and demobilization excludes Bid Items 20, 24, 28 <br />b. Bid item eligible to be funded in full or in part by the Washington State Department of Ecology <br />stormwater grant