My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 45 13 - 5 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br />00 45 13 - 5 BIDDER QUALIFICATION STATEMENT <br />Category 2: Sensive informaon <br />Category 2: For official use only / disclosure permissible by law. <br />ATTACHMENT A: SUPPLEMENTAL RESPONSIBILITY CRITERIA WORKSHEET <br />Bidder: <br /> Similar Project # 1 Answer <br />(1) The project has a total contract value of at least <br />$25,000,000? <br />At least $25,000,000? Yes ☐ No☐ <br />(must be yes) <br />(2) The project includes the construcon, installaon a nd <br />commissioning of potable water or wastewater <br />infrastructure. <br />Includes this infrastructure? Yes ☐ <br />No☐ <br />(must be yes) <br />Which of the following does this infrastructure include? <br />(i) potable water or wastewater treatment plant <br />process system component(s) capable of <br />processing at least one million gallons per day <br />(MGD) of potable water or one MGD of <br />wastewater, <br />(ii) a potable water or wastewater pump staon <br />with daily flow rate of at least one MGD <br />At least one must be checked: <br /> <br />(i)☐ <br />(ii)☐ <br /> <br />(3) The project must include the installaon and <br />commissioning of electrical, instrumentaon, and co ntrols <br />infrastructure. If the installed and commissioned <br />infrastructure does not include all three (electrical, <br />instrumentaon, and controls), it does not meet thi s <br />requirement. <br />Includes all three (electrical, <br />instrumentaon, and controls <br />infrastructure)? <br /> <br />Yes ☐ No☐ <br />(must be yes) <br /> <br /> Similar Project #2 Answer <br />(1) The project has a total contract value of at least <br />$25,000,000? <br />At least $25,000,000? Yes ☐ No☐ <br />(must be yes) <br />(2) The project includes the construcon, installaon a nd <br />commissioning of potable water or wastewater <br />infrastructure. <br />Includes this infrastructure? Yes ☐ <br />No☐ <br />(must be yes) <br />Which of the following does this infrastructure include? <br />(i) potable water or wastewater treatment plant <br />process system component(s) capable of <br />processing at least one million gallons per day <br />(MGD) of potable water or one MGD of <br />wastewater, <br />(ii) a potable water or wastewater pump staon <br />with daily flow rate of at least one MGD <br />At least one must be checked: <br /> <br />(i)☐ <br />(ii)☐ <br /> <br />(3) The project must include the installaon and <br />commissioning of electrical, instrumentaon, and co ntrols <br />infrastructure. If the installed and commissioned <br />infrastructure does not include all three (electrical, <br />instrumentaon, and controls), it does not meet thi s <br />requirement. <br />Includes all three (electrical, <br />instrumentaon, and controls <br />infrastructure)? <br /> <br />Yes ☐ No☐ <br />(must be yes) <br />
The URL can be used to link to this page
Your browser does not support the video tag.