Laserfiche WebLink
City of Everett 00 45 13 - 5 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br />00 45 13 - 5 BIDDER QUALIFICATION STATEMENT <br />Category 2: Sensive informaon <br />Category 2: For official use only / disclosure permissible by law. <br />ATTACHMENT A: SUPPLEMENTAL RESPONSIBILITY CRITERIA WORKSHEET <br />Bidder: <br /> Similar Project # 1 Answer <br />(1) The project has a total contract value of at least <br />$25,000,000? <br />At least $25,000,000? Yes ☐ No☐ <br />(must be yes) <br />(2) The project includes the construcon, installaon a nd <br />commissioning of potable water or wastewater <br />infrastructure. <br />Includes this infrastructure? Yes ☐ <br />No☐ <br />(must be yes) <br />Which of the following does this infrastructure include? <br />(i) potable water or wastewater treatment plant <br />process system component(s) capable of <br />processing at least one million gallons per day <br />(MGD) of potable water or one MGD of <br />wastewater, <br />(ii) a potable water or wastewater pump staon <br />with daily flow rate of at least one MGD <br />At least one must be checked: <br /> <br />(i)☐ <br />(ii)☐ <br /> <br />(3) The project must include the installaon and <br />commissioning of electrical, instrumentaon, and co ntrols <br />infrastructure. If the installed and commissioned <br />infrastructure does not include all three (electrical, <br />instrumentaon, and controls), it does not meet thi s <br />requirement. <br />Includes all three (electrical, <br />instrumentaon, and controls <br />infrastructure)? <br /> <br />Yes ☐ No☐ <br />(must be yes) <br /> <br /> Similar Project #2 Answer <br />(1) The project has a total contract value of at least <br />$25,000,000? <br />At least $25,000,000? Yes ☐ No☐ <br />(must be yes) <br />(2) The project includes the construcon, installaon a nd <br />commissioning of potable water or wastewater <br />infrastructure. <br />Includes this infrastructure? Yes ☐ <br />No☐ <br />(must be yes) <br />Which of the following does this infrastructure include? <br />(i) potable water or wastewater treatment plant <br />process system component(s) capable of <br />processing at least one million gallons per day <br />(MGD) of potable water or one MGD of <br />wastewater, <br />(ii) a potable water or wastewater pump staon <br />with daily flow rate of at least one MGD <br />At least one must be checked: <br /> <br />(i)☐ <br />(ii)☐ <br /> <br />(3) The project must include the installaon and <br />commissioning of electrical, instrumentaon, and co ntrols <br />infrastructure. If the installed and commissioned <br />infrastructure does not include all three (electrical, <br />instrumentaon, and controls), it does not meet thi s <br />requirement. <br />Includes all three (electrical, <br />instrumentaon, and controls <br />infrastructure)? <br /> <br />Yes ☐ No☐ <br />(must be yes) <br />