My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 45 13 - 6 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br />00 45 13 - 6 BIDDER QUALIFICATION STATEMENT <br />Category 2: Sensive informaon <br />Category 2: For official use only / disclosure permissible by law. <br />Bidder: <br /> Similar Excavaon Project Answer <br />(1) The project has total contract value of at least <br />$25,000,000? <br />At least $25,000,000? Yes ☐ <br />No☐ (must be yes) <br />(2) The project includes the construcon, <br />installaon and commissioning of potable water <br />or wastewater infrastructure. <br />Includes this infrastructure? <br />Yes ☐ No☐ <br />(must be yes) <br />Which of the following does this infrastructure <br />include? <br />(i) potable water or wastewater <br />treatment plant process system <br />component(s) capable of processing <br />at least one million gallons per day <br />(MGD) of potable water or one <br />MGD of wastewater, <br />(ii) a potable water or wastewater <br />pump staon with daily flow rate of <br />at least one MGD <br />At least one must be checked: <br /> <br />(i)☐ <br />(ii)☐ <br /> <br />(3) The project must include the installaon and <br />commissioning of electrical, instrumentaon, <br />and controls infrastructure. If the installed and <br />commissioned infrastructure does not include <br />all three (electrical, instrumentaon, and <br />controls), it does not meet this requirement. <br />Includes all three (electrical, <br />instrumentaon, and controls <br />infrastructure)? <br /> <br />Yes ☐ No☐ <br />(must be yes) <br />Excavaon <br />Requirements <br />The project has at least one excavaon at a <br />depth of at least 15 feet? <br />Yes ☐ No☐ (must be yes) <br />The project includes ground water pumping and <br />disposal? <br />Yes ☐ No☐ (must be yes) <br />The project includes installaon of structural <br />ground improvement infrastructure specifically <br />designed to enhance the engineering properes <br />of subsurface soils such as, for example, pile <br />supports, aggregate piers, or soil groung? <br />Preloading and compacon are examples of <br />ground improvements that are not structural <br />and do not meet this requirement. <br />Yes ☐ No☐ (must be yes) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.