Laserfiche WebLink
87 <br />Ca <br />D <br />SCS-PG-20-F-0001 <br />M <br />M M <br />20-DS-0001 <br />P20163 <br />C20065 <br />15-XV-0101 <br />15-XV-0201 <br />20-LCS-0001 <br />? <br />? <br />? <br />? <br />20-PNL-3001 <br />C15201 <br />C15101 <br />P20165 <br />70-MCC-0101 <br />C20001 <br />70-MCC-0101 <br />C20063 <br />C20101 <br />P20207 <br />P20107 <br />20-PNL-7000 <br />P20101 <br />15-DS-0201 <br />15-DS-0101 <br />20-PNL-7000 <br />20-PNL-3000 <br />P20201 <br />0001 <br />TSH <br />P15101 <br />P15201 <br />C20107 <br />C20207 <br />M <br />15-P-3001 <br />3002 <br />LSH <br />20-PNL-7001 <br />C15401 <br />20-PNL-3001 P15401 <br />1 <br />2 <br />2 <br />2 <br />E25001 <br />20-LCS-0107 <br />20-LCS-0207 <br />3 <br />3 <br />3 <br />3 <br />3 <br />4 <br />4 <br />4 <br />5 <br />6 <br />6 <br />6 <br />6 <br />DB0008 <br />DB0009 <br />4 <br />4 <br />6 <br />7 <br />8 <br />9 <br />5 <br />3 5 <br />DB0008 <br />X20001B <br />C20001A <br />P15101A <br />P20201A <br />P20101A <br />P15201A <br />C20063A <br />P20163AC20101A <br />E11001 <br />DB0009 <br />C20065A <br />C20001B <br />P20165A <br />X20001A <br />E11001 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGEAutodesk Docs://157889 - PGSF/E-3525-20-25-30V23.rvt8/6/2025 4:09:41 PMEP-20-1001 <br />413 <br />ELECTRICAL POWER <br />COMBINED SEWER DEBRIS REMOVAL GROUND <br />LEVEL POWER AND CONTROL PLAN <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />SCALE: 3/16" = 1'-0" <br />PLAN <br />KEYNOTES: <br />1 SEE EC-20-1001 FOR LEVEL AND FLOW INSTRUMENTS IN <br />THIS AREA. <br />2 UNCLASSIFIED EQUIPMENT. MUST BE MOUNTED OUTSIDE <br />OF HAZARDOUS AREA. SEE DRAWING G-20-0002. <br />3 ROUTE CONDUIT UP WALL. FOR CIRCUITS GOING TO FOUL <br />AIR EQUIPMENT AND ACTUATOR DISCONNECTS, ROUTE <br />CONDUIT ACROSS AT LEVEL OF FOUL AIR PIPING, SHARING <br />THE SUPPORTS OF THE PIPING, THEN DROP DOWN TO MEET <br />UP WITH DB0008. <br />4 FOR CIRCUIT HOME RUNS GOING TO MCC OR AREA 20 <br />PANELS, CONDUIT CONTINUES UP WALL TO TOP OF DEBRIS <br />REMOVAL AREA THEN OVER TO PANELS AND CABLE TRAY <br />LEADING BACK TO AREA 70. <br />5 FOR CIRCUITS AT FOUL AIR EQUIPMENT GOING BACK TO <br />MCC OR AREA 20 PANELS, FOLLOW ROUTING STATED IN <br />KEYNOTE 4, THEN FOLLOW KEYNOTE 5. <br />6 SEE SECTION 2 THIS SHEET FOR DUCT BANK CONDUIT <br />INFORMATION. <br />7 SEE SECTION 3 THIS SHEET FOR DUCT BANK CONDUIT <br />INFORMATION. <br />8 ROUTE CONDUITS ACROSS SLAB AND THROUGH DB0009. <br />SECURE CONDUIT TO SLAB, AVOID ALL OPENINGS, PIPING, <br />AND APPURTENANCES OF OTHER DISCIPLINES. PROVIDE <br />"SPEED BUMP" TYPE CONDUIT COVERS TO PREVENT <br />TRIPPING HAZARDS. <br />GENERAL NOTES: <br />1. SEE DRAWING G-20-0002 FOR HAZARDOUS AREA <br />BOUNDARIES. EQUIPMENT MUST BE RATED FOR THE <br />HAZARDOUS AREA IT IS LOCATED IN. <br />EP-20-1001 <br />2 SECTION <br />EP-20-1001 <br />3 SECTION <br />09/03/2025 ZB