My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
J <br />J <br />J <br />J <br />Bd <br />87 <br />Ca <br />20-SCRN-0202 <br />20-SCRN-0102 <br />M M <br />M <br />P20071 <br />20-LCP-0102 <br />M <br />20-CON-0105 <br />20-DS-0106 <br />20-DS-0105 <br />P20053 <br />0106 <br />SE/SC/SSL <br />0105 <br />SE/SC/SSL <br />TO CTP1011 <br />P20045 <br />P20051 <br />20-PNL-3001 <br />20-PNL-3000 <br />P20009 <br />CTP1011P20001 <br />P20003 <br />P20002 <br />P20047 70-SW BD-0001P70009 <br />0202 <br />WSH <br />0202 <br />TSH <br />0105 <br />TSH <br />0106 <br />TSH <br />0102 <br />WSH <br />0102 <br />TSH <br />M M <br />20-PNL-7000 <br />C20400 <br />20-PNL-7000 <br />C20300 <br />70-MCC-0101 <br />C20105 <br />20-CJB-0105 <br />C20165 <br />C20164 <br />70-MCC-0101 <br />C20106 <br />20-CJB-0106 <br />C20155 <br />C20154 <br />20-DS-0208 P20208 <br />P20108 <br />0110 <br />AIT <br />0110 <br />AE <br />0109-B <br />AE <br />0109-A <br />AE <br />0109 <br />AIT <br />20-DS-0208 <br />20-DS-0108 <br />20-PNL-3000 <br />P20118 <br />P20218 <br />20-DS-0108 <br />20-PNL-7001 <br />C20222 <br />C20002 <br />C20109 <br />20-CJB-0102 <br />C20003 <br />20-LCP-0102 20-CJB-0202 <br />20-LCP-0102 <br />C20204 <br />0103 <br />FIT1 <br />20-PNL-7000 <br />P20204 <br />P20203 <br />P20103 <br />2 <br />C20007 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />2 <br />P20109 <br />P20111 <br />P20112 <br />P20114 <br />P20075 <br />C20110 <br />P20110 <br />P20115 <br />P20116 <br />20-CON-0106 <br />20-DS-0105 <br />C20152 <br />20-DS-0106 <br />C20162 <br />0203 <br />FIT <br />0204 <br />FIT <br />1 <br />1 <br />20-PNL-7010 <br />20-PNL-0109A <br />20-PNL-0109B <br />20-HS-0106C <br />E-STOP <br />20-LCS-0102 20-LCS-0202 <br />20-G-0208 <br />20-G-0108 <br />20-HS-0105C <br />E-STOP <br />20-PNL-0110A <br />20-PNL-0110B <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGEAutodesk Docs://157889 - PGSF/E-3525-20-25-30V23.rvt8/6/2025 4:09:42 PMEP-20-1002 <br />414 <br />ELECTRICAL POWER <br />COMBINED SEWER DEBRIS REMOVAL ROOF <br />POWER AND CONTROL PLAN <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />SCALE: 3/16" = 1'-0" <br />PLAN <br />KEYNOTES: <br />1 MOUNT REMOTE TRANSMITTERS VERTICALLY ON <br />EQUIPMENT RACK. <br />2 COMBUSTIBLE GAS DETECTION SAMPLING MODULE. <br />3 UNCLASSIFIED EQUIPMENT. MUST BE MOUNTED OUTSIDE <br />OF HAZARDOUS AREA. SEE DRAWING G-20-0002. <br />GENERAL NOTES: <br />1. SEE DRAWING G-20-0002 FOR HAZARDOUS AREA <br />BOUNDARIES. EQUIPMENT MUST BE RATED FOR THE <br />HAZARDOUS AREA IT IS LOCATED IN. <br />09/03/2025 ZB
The URL can be used to link to this page
Your browser does not support the video tag.