Laserfiche WebLink
GGGGGGGGGG GGG <br />G GGG <br />Bd <br />87 <br />Ca <br />CTS011 <br />BOT: 2' -8" <br />CTC011 <br />BOT: 2' -8" <br />CTP1011 <br />BOT: 2' -8" <br />MATCHLINE <br />SEE DWG 2 / EG-25-10011 <br />1 <br />1 <br />2 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-20-25-30V23.rvt8/26/2025 11:29:42 AMEG-20-1002 <br />473 <br />ELECTRICAL GROUNDING <br />COMBINED SEWER DEBRIS REMOVAL ROOF <br />CABLE TRAY AND GROUNDING PLAN <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />SCALE: 3/16" = 1'-0" <br />PLAN <br />KEYNOTES: <br />1 ELEVATION SHOWN FOR THIS CABLE TRAY IS MEASURED <br />FROM LEVEL "T/INFLUENT BUILDING LOW ROOF" (EL 42'-7"). <br />2 BOND EQUIPMENT GROUNDING CONDUCTOR TO EXISTING <br />BUILDING GROUNDING SYSTEM. <br />GENERAL NOTES: <br />1. CONTRACTOR TO FIELD LOCATE AND VERIFY EXISTING <br />BUILDING GROUNDING SYSTEM. <br />2. BONDING CONDUCTOR PER SPECIFICATIONS. BOND TO <br />HANDRAILS, VALVE OPERATORS, PIPES, LIGHT POLES, <br />AND OTHER METAL EQUIPMENT.