Laserfiche WebLink
GGGG <br />GG <br />DSGG <br />Aa <br />Ab <br />Ac <br />Ba <br />Bb <br />Bc <br />Bd <br />87 <br />Ca <br />B <br />101 <br />PROCESS PIPE ROOM 1 <br />102 <br />PROCESS PIPE ROOM 2 <br />1 <br />Aa <br />Ab <br />Ac <br />Ba <br />Bb <br />Bd <br />87 <br />B <br />205 <br />PROCESS PIPE ROOM 3 <br />204 <br />UNUSED AREA 4 <br />201 <br />UNUSED AREA 1 <br />CTS011 <br />BOT: 13' -6" <br />CTC011 <br />BOT: 12' -0" <br />CTP1011 <br />BOT: 10' -6"MATCHLINESEE DWG 1 / EG-30-1002CTS011 <br />BOT: 9' -7" <br />CTC011 <br />BOT: 9' -7" <br />CTP1011 <br />BOT: 9' -7" <br />MATCHLINE <br />SEE DWG 3 / EG-25-1001 <br />3 <br />3 <br />3 <br />4 <br />4 <br />4 <br />CTS011 <br />BOT: 11' -7" <br />CTC011 <br />BOT: 11' -7" <br />CTP1011 <br />BOT: 11' -7"4 <br />4 <br />6 <br />6 <br />E22002 <br />202 <br />UNUSED AREA 2 <br />4 <br />E32007 <br />E32008 TYP <br />1 2 <br />E32007 <br />E32008 TYP <br />1 2 <br />1 <br />EG-25-3001 <br />Aa <br />Ab <br />Ac <br />Ba <br />Bb <br />87 <br />E32007 <br />E32008 TYP <br />1 2 <br />MATCHLINE <br />SEE DWG 2 / EG-25-1001 <br />CTS011 <br />BOT: 2' -8" <br />CTC011 <br />BOT: 2' -8" <br />CTP1011 <br />BOT: 2' -8" <br />5 <br />5 <br />5 <br />MATCHLINE <br />SEE DWG 1 / EG-20-1002 <br />2 <br />EG-25-3001 <br />7 <br />8 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-20-25-30V23.rvt8/26/2025 11:29:46 AMEG-25-1001 <br />474 <br />ELECTRICAL GROUNDING <br />INFLUENT BUILDING CABLE TRAY AND <br />GROUNDING PLANS <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />KEYNOTES: <br />1 BOND EQUIPMENT GROUNDING CONDUCTOR TO EXISTING <br />BUILDING GROUNDING SYSTEM. <br />2 GROUNDING OF CABLE TRAY SYSTEM IS TO FOLLOW NEC IN <br />REGARDS TO NUMBER OF BONDING POINTS AND SPACING <br />OF BONDING POINTS. <br />3 ELEVATION SHOWN FOR THIS CABLE TRAY IS MEASURED <br />FROM LEVEL "GROUND LEVEL TOC" (EL 17'-3"). <br />4 ELEVATION SHOWN FOR THE CABLE TRAY IS MEASURED <br />FROM LEVEL "T/PRIMARY STORAGE WALKWAY" (EL 33'-9"). <br />5 ELEVATION SHOWN FOR THIS CABLE TRAY IS MEASURED <br />FROM LEVEL "T/INFLUENT BUILDING LOW ROOF" (EL 42'-7"). <br />6 CABLE TRANSIT SYSTEM FOR WALL PENETRATIONS. <br />ROXTEC GH BG 6x1 FL100 OR APPROVED SIMILAR. SEE <br />EG-25-3001 AND ELECTRICAL STANDARD DETAIL E24003 FOR <br />MORE INFORMATION. <br />7 LIGHTNING PROTECTION SYSTEM DESIGNED PER <br />SPECIFICATION 26 24 13. REFER TO SPECIFICATIONS. <br />8 ROUTE TRAY ALONG ROOF AT WORKING HEIGHT, SUPPORT <br />PER SPECIFICATIONS. USE ROOF SUPPORT SYSTEM BASES <br />(UNISTRUT OR SIMILAR) THAT DO NOT PENETRATE ROOF <br />MEMBRANE. <br />SCALE: 1/8" = 1'-0" <br />INFLUENT BUILDING LOWER PLAN1 SCALE: 1/8" = 1'-0" <br />INFLUENT BUILDING UPPER PLAN2 SCALE: 1/8" = 1'-0" <br />INFLUENT BUILDING ROOF PLAN3 <br />GENERAL NOTES: <br />1. CONTRACTOR TO FIELD LOCATE AND VERIFY EXISTING <br />BUILDING GROUNDING SYSTEM. <br />2. ALL RACEWAY SUPPORTS TO BE PROVIDED BY <br />CONTRACTOR PER SPECIFICAITONS.