Laserfiche WebLink
GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG <br />G <br />G <br />654321 <br />A <br />B <br />D <br />C <br />SEE DRAWING EG-70-2002 <br />MATCHLINESEE DWG 2 / EG-25-1001CTP1015 <br />BOT: 10' -6" <br />CTC015 <br />BOT: 12' -0" <br />CTS015 <br />BOT: 13' -6" <br />CTS002 <br />BOT: 13' -6" <br />CTC002 <br />BOT: 12' -0" <br />CTP1002 <br />BOT: 10' -6" <br />CTS011 <br />BOT: 13' -6" <br />CTC011 <br />BOT: 12' -0" <br />CTP1011 <br />BOT: 10' -6" <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />CELL 15 <br />CELL 14 <br />CELL 13 <br />CELL 12 <br />CELL 11 <br />CELL 10 <br />CELL 9 <br />CELL 8 <br />CELL 7 <br />CELL 6 CELL 3 <br />CELL 5 CELL 2 <br />CELL 4 CELL 1 <br />3 <br />3 <br />3 3 <br />3 3 <br />MATCHLINE <br />4 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />55755JAMESA.TU <br />C <br />KERPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-20-25-30V23.rvt8/26/2025 11:29:54 AMEG-30-1002 <br />476 <br />ELECTRICAL GROUNDING <br />PRIMARY COMBINED SEWER STORAGE UPPER <br />CABLE TRAY AND GROUNDING PLAN <br />K. MONTPETIT <br />S. CANAS <br />J. TUCKER <br />KEYNOTES: <br />1 CABLE TRAY ROUTES WEST BELOW PRIMARY STORAGE <br />WALKWAY TOWARDS AREA 40, 50, AND 60. <br />2 CABLE TRAY ROUTES EAST BELOW PRIMARY STORAGE <br />WALKWAY THEN TURNS SOUTH PAST GRIDLINE 6 <br />TOWARDS THE INFLUENT BUILDING. <br />3 BOND EQUIPMENT GROUNDING CONDUCTOR TO <br />EXISTING BUILDING GROUNDING SYSTEM. <br />4 EXTEND GROUNDING SYSTEM TO CONVEYANCE DRAIN <br />PUMP STATION STRUT RACK. SEE 5 / EP-10-2005. <br />GENERAL NOTES: <br />1. ELEVATIONS SHOWN FOR CABLE TRAY ARE MEASURED <br />FROM LEVEL "GROUND LEVEL TOC" (EL 17'-3"). <br />2. CONTRACTOR TO FIELD LOCATE AND VERIFY EXISTING <br />BUILDING GROUNDING SYSTEM. <br />3. BONDING CONDUCTOR PER SPECIFICATIONS. BOND TO <br />HANDRAILS, VALVE OPERATORS, PIPES, LIGHT POLES, <br />AND OTHER METAL EQUIPMENT. <br />SCALE: 1/16" = 1'-0" <br />PLAN <br />1 09/03/25 C. GISH CONFIRMED DRAWING PER ADDENDUM NO. 4