My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
GGGGGGGGGG <br />G <br />ABCDE4321DB00006ADB00006DB00006BMH01021E31002E31003E39003KEY PLANSCALE: NTSEALNIONG <br />TRSR FO ESPSTA EREERSGEITEGIDNT NO <br />EHOFWASNI55755JAMESA.TUCK E R <br />PLANS ISSUED FORBIDACTIONDATEAPRVD ACTION DATE APRVD ACTION DATE APRVDCONSTRECORDDrawingSheet No.Of TotalDesignedDrawnCheckedDesign Review Level500Plot dateFilepath\FilenameWO# UP-3525PORT GARDNEReverettwa.gov3200 Cedar StreetEverett, WA 98201425.257.8800NO. DATE APRVDREVISION12/2/2024ZBSTORAGE FACILITY -FACILITY CONSTRUCTION PACKAGE09/03/2025 ZBAutodesk Docs://157889 - PGSF/E-3525-40V23.rvt8/26/2025 11:57:27 AMEG-40-1001477ELECTRICAL GROUNDINGSTORMWATER DIVERSION AND TREATMENTGROUNDING PLANK. MONTPETITS. CANASJ. TUCKERSCALE: 1/8" = 1'-0"PLANGENERAL NOTES:1. BONDING CONDUCTOR PER SPECIFICATIONS. BOND TO HANDRAILS, VALVE OPERATORS, PIPES, AND OTHER METAL EQUIPMENT.KEYNOTES:1 SEE DRAWING EG-60-1001 FOR DETAILS ON CABLE TRAYIN THIS AREA.
The URL can be used to link to this page
Your browser does not support the video tag.