My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />D-30-3002 <br />6 <br />D-30-3002 <br />2 <br />D-30-3004 <br />3 <br />D-30-3004 <br />A <br />30" CS 30" RCCP <br />20" CS <br />4" 2W <br />D30001P <br />NOTE: VAULT LID NOT SHOWN FOR CLARITY, <br />HATCH IS SHOWN IN DASHED LINES FOR REFERENCE. <br />VAULT STRUCTURE AND HATCH AS INDICATED ON <br />STRUCTURAL DRAWINGS. <br />20" CS <br />20" CS <br />20" CS <br />6" CS <br />1 <br />S53001 <br />2 <br />2 <br />3 <br />4 <br />30-VLV-0002 <br />1 <br />5 <br />6 <br />7 <br />8 <br />D12003 <br />D12003 <br />D-30-2007 SCALE: 1/2" = 1'-0" <br />1 PRIMARY STORAGE OVERFLOW PLAN <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-20-25-30V23.rvt8/29/2025 7:28:49 AMD-30-2011 <br />334 <br />PROCESS <br />PRIMARY COMBINED SEWER STORAGE <br />PARTIAL PIPING PLAN 10 <br />M. BRAY <br />T. LEMON <br />R. LONG <br />GENERAL NOTES: <br />1. PROVIDE PROFESSIONAL ENGINEERING SERVICES FOR <br />DESIGN OF ALL PIPE SUPPORTS PER SECTION 40 05 01. ANY <br />PIPE SUPPORTS SHOWN ON THE DRAWINGS ARE <br />CONCEPTUAL ONLY. <br />2. 2W WATER ROUTED BELOW WALKWAY OR DECK. 2W <br />PIPING DEPICTED WITH DASHED LINES TO BE ROUTED <br />BELOW THE DECK. <br />KEYNOTES: <br />1 SEE CIVIL FOR CONTINUATION. <br />2 DISMANTLING JOINT PER SECTION 40 05 06. <br />3 CHECK VALVE PER SECTION 40 05 65.31 <br />4 20-IN X 6-IN TEE. <br />5 STEEL TO HDPE MATERIALS TRANSITION <br />6 KNIFE GATE VALVE PER SECTION 40 05 61.43 <br />7 FIELD VERIFY EXISTING PIPING ARRANGEMENT AND <br />FURNISH FITTINGS AS REQUIRED. <br />8 BUTT STRAP CONNECTION TO EXISTING 30-IN DIA CCP <br />PIPE PER DETAIL 1/D-30-3006. FIELD VERIFY <br />CONFIGURATION AND DIAMETER OF EXISTING PIPE AND <br />COORDINATE WITH SPECIFIED BUTT STRAP. SUBMIT <br />PROPOSED CONNECTION DETAIL PER 40 05 01. <br />1 09/03/25 C. GISH CONFORMED DRAWING PER ADDENDUM NO. 4
The URL can be used to link to this page
Your browser does not support the video tag.