Laserfiche WebLink
T/BOTTOM PLAN <br />EL 10.78' <br />3" 2W 8" 2W 3" 2W <br />16" CS 16" CS 16" CS <br />30-G-0102 30-G-010130-G-020230-G-030130-G-0302 <br />9.20'9.21' <br />A B DC <br />1 <br />2 <br />(TYP) <br />30-G-0201 <br />9.20' <br />T/PRIMARY STORAGE WALKWAY <br />EL 33.78' <br />T/BOTTOM PLAN <br />EL 10.78' <br />30-G-0501 30-G-0502 <br />16" CS 16" CS 16" CS <br />30-G-040230-G-0401 30-G-0601 30-G-0602 <br />3" 2W 3" 2W <br />ABDC <br />T/PRIMARY STORAGE WALKWAY <br />EL 33.78' <br />T/BOTTOM PLAN <br />EL 10.78' <br />16" CS 16" CS <br />16" CS30-G-0903 <br />CELL 9 DRAINAGE <br />SLIDE GATE <br />30-G-0803 <br />CELL 8 DRAINAGE <br />SLIDE GATE <br />30-G-0703 <br />CELL 7 DRAINAGE <br />SLIDE GATE <br />A B C <br />D-30-3001 <br />4 <br />T/PRIMARY STORAGE WALKWAY <br />EL 33.78' <br />3 <br />4 <br />5 <br />30-G-0703 <br />CELL 7 DRAINAGE <br />SLIDE GATE <br />16" CS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-20-25-30V23.rvt8/26/2025 10:19:17 AMD-30-3001 <br />335 <br />PROCESS <br />PRIMARY COMBINED SEWER STORAGE <br />SECTIONS <br />M. BRAY <br />T. LEMON <br />R. LONG <br />D-30-1001 SCALE: 1/8" = 1'-0" <br />1 FLUSHING GATES 1 <br />GENERAL NOTES: <br />D-30-1001 SCALE: 1/8" = 1'-0" <br />2 FLUSHING GATES 2 <br />D-30-1001 SCALE: 1/8" = 1'-0" <br />3 DRAINAGE SLIDE GATES <br />1. PROVIDE PROFESSIONAL ENGINEERING SERVICES FOR <br />DESIGN OF ALL PIPE SUPPORTS PER SECTION 40 05 01. ANY <br />PIPE SUPPORTS SHOWN ON THE DRAWINGS ARE <br />CONCEPTUAL ONLY. <br />KEYNOTES: <br />1 FIELD ROUTE HYDRAULIC TUBING AS INDICATED ON <br />D-70-1001. INSTALL AND SUPPORT TUBING AS <br />RECOMMENDED BY FLUSHING GATE MANUFACTURER. <br />TYPICAL ALL FLUSHING GATES. <br />2 FLUSHING GATE INVERTS AS INDICATED ON THE <br />STRUCTURAL DRAWINGS. <br />3 16-IN CS BEYOND GATE IN TRENCH. MATCH GATE AND <br />PIPE INVERTS. <br />4 EMBEDDED AND WALL MOUNTED GATE FRAME. WALL <br />MOUNT PORTION THAT EXTENDS BEYOND THE TRENCH. <br />5 GATE INVERT FLUSH WITH BOTTOM OF THE TRENCH. NO <br />PORTION OF THE GATE FRAME MAY OBSTRUCT FLOW IN <br />THE TRENCH. CHIP OUT THE EXISTING TRENCH AS <br />NEEDED TO INSTALL THE FRAME. <br />D-30-3001 SCALE: 1/2" = 1'-0" <br />4 DRAINAGE SLIDE GATE (TYP)