My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
18" SW20" SW <br />IE = 1.20 <br />SEE DRAWING C-10-1301 <br />FOR CONTINUATION MATCHLINESEE DWG 1 / D-40-10011 <br />D-40-3003 <br />2 <br />D-40-3003 <br />36" SW <br />20" SW <br />1 <br />1 <br />2 <br />8" D <br />2 <br />2 <br />2 <br />3 <br />4 <br />5 <br />6 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />3 <br />24 <br />7 <br />6" <br />6" <br />6" <br />6" <br />6" <br />6" <br />6 <br />2 <br />7 <br />2 <br />7 <br />2 <br />7 <br />2 <br />7 <br />2 <br />7 <br />8 <br />9 <br />8 <br />SEE DRAWING C-10-1302 <br />FOR CONTINUATION. <br />SEE DRAWING C-10-1302 <br />FOR CONTINUATION. <br />6" SW <br />2 <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />57595M YOLL Y E. <br />B <br />R <br />APLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-40V23.rvt8/26/2025 10:52:58 AMD-40-1003 <br />348 <br />PROCESS <br />STORMWATER TREATMENT STRUCTURE <br />LOWER PLAN <br />J. FU <br />T. LEMON <br />M. BRAY <br />SCALE: 3/16" = 1'-0" <br />STORMWATER TREATMENT STRUCTURE LOWER PLAN <br />KEYNOTES: <br />1 6" PERF PIPE PER SECTION 33 46 59. PERFORATED PIPING <br />TO BE PROVIDED AS PART OF VENDOR PACKAGE. <br />2 PIPE PENETRATION, SEE DETAIL D12003. <br />3 20" BLIND FLANGE. <br />4 20" CLEANOUT. <br />5 6" X 20" TEE. <br />6 HDPE/PVC PIPE MATERIAL TRANSITION. <br />7 6" HDPE WITH BLIND FLANGE FOR CONNECTION TO <br />FUTURE UNDERDRAIN PIPING. <br />8 20" X 36" ECCENTRIC REDUCER INSTALL FLAT ON THE <br />EAST SIDE. <br />9 36" X 36" TEE BRANCH FACING DOWN, CONNECTING TO <br />90-DEGREE BEND. SEE DETAIL 1/D-40-3003
The URL can be used to link to this page
Your browser does not support the video tag.