My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SEE DRAWING D-40-3002 <br />FOR CONTINUATION <br />INV EL 12.90' <br />48" SW <br />PIPE SUPPORT. SEE STRUCTURAL <br />DRAWINGS <br />TOG EL 14.30' <br />40-XV-000140-XV-0002 <br />INV EL 0.36' <br />TOG EL 14.30' <br />1 <br />24" SW <br />3" V <br />3" SW <br />EL 19.98' <br />CL EL 17.57' <br />23 <br />T/THICKENER <br />EL 23.78' <br />T/CONC DIVERSION <br />EL 11.35' <br />48" SW <br />INV EL 7.72' <br />4 <br />4 <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />24128JOHNP.RIE <br />GELPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-40V23.rvt8/26/2025 10:53:03 AMD-40-3001 <br />350 <br />PROCESS <br />DIVERSION STRUCTURE SECTION <br />J. RIEGEL <br />T. LEMON <br />M. BRAY <br />D-40-1001 SCALE: 3/8" = 1'-0" <br />1 DIVERSION STRUCTURE SECTION <br />KEYNOTES: <br />1 24" HDPE BLIND FLANGE W/ (2) HANDLES. <br />2 3" FLANGED PLUG VALVE WITH LEVER OPERATOR PER 40 <br />05 62.01. <br />3 NOT USED <br />4 DISMANTLING JOINT PER 40 05 06.
The URL can be used to link to this page
Your browser does not support the video tag.