Laserfiche WebLink
2 <br />D-60-3001 <br />1 <br />D-60-3001 <br />36" CS <br />1 <br />D-60-3002 <br />60-G-0003 <br />EFFLUENT PUMP <br />STATION INFLUENT <br />SLIDE GATE <br />60-P-0101 <br />60-P-0102 <br />60-P-0103 <br />60-VLV-0302 <br />A B C <br />1 <br />2 <br />3 <br />20" CS <br />SEE STRUCTURAL <br />0103 <br />TSH <br />0103 <br />MSH <br />0102 <br />TSH <br />0102 <br />MSH <br />0101 <br />TSH <br />0101 <br />MSH <br />1 <br />0001 <br />LT <br />0001 <br />LE <br />0002 <br />LSH <br />SEE DRAWING C-10-1302 <br />FOR CONTINUATION <br />SEE DRAWING C-10-1302 <br />FOR CONTINUATION <br />SEE DRAWING C-10-1302 <br />FOR CONTINUATION <br />3" D <br />2 <br />D-60-3001 <br />1 <br />D-60-3001 <br />1 <br />D-60-3002 <br />60-VLV-0302 <br />60-VLV-0301 <br />0105 <br />FE <br />A B C <br />1 <br />2 <br />3 <br />D31001 <br />60-CHV-0103 <br />60-VLV-0203 <br />60-CHV-0102 <br />60-VLV-0202 <br />60-CHV-0101 <br />60-VLV-0201 <br />24" CS <br />0106 <br />PI <br />0104 <br />PIT <br />60-ARV-0008 <br />16" CS <br />16" CS <br />16" CS <br />KEY PLAN <br />SCALE: NTS <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />R39155ICHARDEUGENELONGPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-60V23.rvt8/26/2025 11:11:20 AMD-60-1001 <br />365 <br />PROCESS <br />EFFLUENT PUMP STATION PLANS <br />C. LAIRD <br />T. LEMON <br />R. LONG <br />D-60-3001 SCALE: 1/4" = 1'-0" <br />1 EFFLUENT PUMP STATION LOWER PLAN <br />D-60-3001 SCALE: 1/4" = 1'-0" <br />2 EFFLUENT PUMP STATION UPPER PLAN <br />KEYNOTES: <br />1 TRANSITION TO HDPE PIPE.