My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
UTILITY STATION <br />GROUND EL APPROX. EL 13.50' <br />36" CS <br />60-P-010160-P-010260-P-0103 <br />2 <br />D-60-3002 <br />2 <br />D-60-3002 <br />2 <br />D-60-3002 <br />0105 <br />FE <br />CL EL 20.00' <br />5' - 0"6' - 8"6' - 8"6' - 8" <br />0106 <br />PI <br />0104 <br />PIT <br />16" CS16" CS16" CS <br />24" CS <br />60-ARV-0008 <br />CL EL 28.80' <br />CL EL 25.13' <br />CL EL 2.50' <br />SHELF EL -2.62' <br />1 20" CS <br />24" CS <br />BEHIND 20" <br />20" CS <br />1 24" CS <br />0002 <br />LSH <br />2 0001 <br />LE <br />0001 <br />LTEL 8.00' <br />CL EL 8.57' (24") <br />60-G-0003 <br />EFFLUENT PUMP <br />STATION INFLUENT <br />SLIDE GATE <br />SEE DRAWING C-10-1302 <br />FOR CONTINUATION 3' - 10 7/32"60-VLV-0401 <br />SLOPE 1/8" / 1'-0" <br />3 <br />CL EL 7.64' (20") <br />4 4 <br />TYP 3 <br />PLACES <br />TOC UPPER EPS <br />EL17.20' <br />TOC EPS <br />EL-9.28' <br />CL EL 20.00' <br />60-P-0103 <br />60-G-0003 <br />EFFLUENT PUMP <br />STATION INFLUENT <br />SLIDE GATE <br />ABC <br />CL EL 25.13' <br />D31002 <br />0104 <br />PIT <br />0105 <br />FE <br />0106 <br />PI <br />SHELF EL -2.62' <br />T/ROOF <br />EL33.87' <br />4 <br />TYP 2 PER <br />PUMP <br />5 <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />R39155ICHARDEUGENELONGPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/D-3525-60V23.rvt8/26/2025 11:11:28 AMD-60-3001 <br />366 <br />PROCESS <br />EFFLUENT PUMP STATION SECTIONS <br />C. LAIRD <br />T. LEMON <br />R. LONG <br />D-60-1001 SCALE: 1/4" = 1'-0" <br />1 SECTION <br />D-60-1001 SCALE: 1/4" = 1'-0" <br />2 SECTION <br />KEYNOTES: <br />1 TRANSITION TO HDPE PIPE. <br />2 FLOAT SWITCH MOUNTING RAIL. <br />3 PROVIDE FLOOR BOX WITH COVER PLATE FOR SLIDE GATE <br />OPERATOR, SEE SPEC 40 05 59.23. INSTALL COVER PLATE <br />FLUSH WITH CONCRETE FLOOR. <br />4 CONTRACTOR DESIGNED PIPE SUPPORT PER 40 05 07.00. <br />ATTACH TO STRUCTURAL FRAMING. <br />5 MOUNT PUMP BASE ELBOW PER 43 05 13 <br />1 09/03/25 C. GISH CONFORMED DRAWING PER ADDENDUM NO. 4
The URL can be used to link to this page
Your browser does not support the video tag.