My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
T/BOTTOM PLAN <br />EL 10.78' <br />D13006 <br />D13006 <br />T/INFLUENT BUILDING LOW ROOF <br />EL 42.66' <br />T/ROOF DEBRIS REMOVAL <br />EL 38.28' <br />4" PD <br />36" FRP <br />36" FRP <br />6" D <br />3" PD <br />LSHH <br />0006 <br />6" D <br />LSH <br />0006 <br />LSL <br />0006 <br />18" CS <br />25-P-0001 <br />T/BOTTOM PLAN <br />EL 10.78' <br />EXISTING FLOOR <br />DRAIN -FIELD <br />VERIFY ELEVATIONS <br />1 <br />2 <br />2 <br />4" PD <br />36" FRP <br />36" FRP <br />6 <br />6" SD <br />T/INFLUENT BUILDING LOW ROOF <br />EL 42.66' <br />8" 2W <br />DOWNSPOUT <br />NOZZLE3 <br />1" 2W <br />4 <br />T/BOTTOM PLAN <br />EL 10.78' <br />NEW TRENCH DRAIN <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />C49625ARTERBIESE <br />M <br />EEYRPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/P-3525-20-25-30V23.rvt8/27/2025 8:21:03 AMP-25-3002 <br />381 <br />PLUMBING <br />INFLUENT BUILDING SECTIONS AND DETAILS <br />C. BIESEMEYER <br />J. CONAWAY <br />R. LONG <br />P-25-1001 SCALE: 1/4" = 1'-0" <br />1 DRAIN PIPING SECTION <br />SCALE: 1/4" = 1'-0" <br />2 DRAIN PIPING SECTION <br />KEYNOTES: <br />1 PROVIDE TRENCH DRAIN, SEE STRUCTURAL DRAWINGS <br />2 PENETRATE EXISTING FRP PIPE WITH TANGENTIAL <br />DRAIN. <br />3 SD - STORMDRAIN PIPE USED FOR OVERFLOW ROOF <br />DRAIN SYSTEM SHALL BE PIPED AND INSTALLED PER <br />LOCAL PLUMBING CODES, INCLUDING DISTINCT <br />DISCHARGE FROM PRIMARY DRAIN SYSTEMS. <br />4 INSULATE AND HEAT TRACE 1" 1W&2W AND 8" 1W&2W <br />PIPE. PROVIDE TSTAT CONTROLLER AND MIN CABLE <br />RATING 3.0 W/FT. PROVIDE ACCESSIBLE HEAT TRACE <br />THERMOSTAT ASSEMBLY. FIELD COORDINATE <br />THERMOSTAT INSTALLATION PER MANUFACTURER <br />REQUIREMENTS WITH EXISTING HANDRAIL AND <br />FEATURES ON THE ROOF. <br />1. CONTRACTOR SHALL PROVIDE PROFESSIONAL <br />ENGINEERING SERVICES FOR DESIGN OF ALL PIPE <br />SUPPORTS PER SECTION 40 05 01. ANY PIPE SUPPORTS <br />SHOWN ON THE DRAWINGS ARE CONCEPTUAL ONLY. <br />SCALE: 1/4" = 1'-0" <br />3 OVERFLOW ROOF DRAIN DETAIL <br />D-30-2002 SCALE: 1/4" = 1'-0" <br />4 NEW TRENCH DRAIN <br />GENERAL NOTES:
The URL can be used to link to this page
Your browser does not support the video tag.