My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (2)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 3:18:23 PM
Creation date
12/9/2025 1:50:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 6-7
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
T/BOTTOM PLAN <br />EL 10.78' <br />SECOND FLOOR NORTH <br />EL 33.01' <br />8" 1W <br />1 2 <br />6" SD <br />6" SD <br />6" SD <br />6" SD <br />6" SD <br />6" SD <br />T/INFLUENT BUILDING HIGH ROOF <br />EL 52.07' <br />T/INFLUENT BUILDING LOW ROOF <br />EL 42.66' <br />18" CS <br />1" LP DRAIN <br />1" 1W <br />8" 1W <br />8" PLUG VALVE <br />8" 1W <br />NEW TRENCH DRAIN3 <br />EALNIO N GTR <br />SRFOE <br />SPSTA EREERSGEITE G ID NTNOE <br />HOFWAS <br />N <br />I <br />C49625ARTERBIESE <br />M <br />EEYRPLANS ISSUED FOR <br />BID <br />ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVD <br />CONST RECORD <br />Drawing <br />Sheet No. <br />Of Total <br />Designed <br />Drawn <br />Checked <br />Design Review Level <br />500 <br />Plot dateFilepath\FilenameWO# UP-3525 <br />PORT GARDNER <br />everettwa.gov <br />3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 <br />NO. DATE APRVD REVISION <br />12/2/2024 ZB <br />STORAGE FACILITY - <br />FACILITY CONSTRUCTION PACKAGE <br />09/03/2025 ZBAutodesk Docs://157889 - PGSF/P-3525-20-25-30V23.rvt8/27/2025 8:21:01 AMP-25-3001 <br />380 <br />PLUMBING <br />INFLUENT BUILDING SECTION <br />C. BIESEMEYER <br />J. CONAWAY <br />R. LONG <br />KEYNOTES: <br />1 8" REDUCED PRESSURE DETECTOR ASSEMBLY PER STD <br />517. <br />2 PROVIDE FITTED REMOVABLE INSULATION COVER PER <br />ASSE 1060 CLASS I, THERMAXX OR EQUAL. <br />3 TRENCH DRAIN INSTALLED PER MANUFACTURER <br />REQUIREMENTS. TRENCH DRAIN SHALL BE HDPE, ZURN <br />Z882, OR EQUAL. CONTRACTOR SHALL FIELD VERIFY <br />EXISTING FLOOR DRAIN ELEVATIONS AND INSTALL <br />TRENCH DRAIN TO ACCEPT FLOWS FROM EXISTING <br />DRAINS. <br />D-30-2001 SCALE: 1/4" = 1'-0" <br />1 INFLUENT BUILDING SECTION
The URL can be used to link to this page
Your browser does not support the video tag.