My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 43 36 - 2 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br /> <br />00 43 36 - 2 PROPOSED SUBCONTRACTOR FORM <br /> <br /> <br />Type/Scope of Work Name and Address of Subcontractor or <br />Bidder and License Number <br />HEATING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />PLUMBING (as described in RCW Ch. 18.106) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />ELECTRICAL (as described in RCW Ch. 19.28) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />Errors identified by the City in the proof of license information must be corrected by the <br />Bidder within 48 hours of submission. <br /> <br /> <br /> <br />Type/Scope of Work Name and Address of Subcontractor or <br />Bidder <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />REBAR INSTALLATION Subcontractor, bidder or <br />“no work” MUST be stated <br /> <br />END OF SECTION 00 43 36 <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.