My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 43 36 - 1 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br /> <br />00 43 36 - 1 PROPOSED SUBCONTRACTOR FORM <br /> <br /> <br />SECTION 00 43 36 – PROPOSED SUBCONTRACTORS FORM <br />1. Bidder SHALL identify in the table below the licensed Subcontractors with whom it <br />will subcontract to perform the heating, ventilation and air conditioning, plumbing <br />(as defined by RCW Chap. 18.106), and electrical work (as defined by RCW Chap. <br />19.28). Bidder may identify itself to perform this work provided that Bidder is <br />licensed to perform the work for which it has identified itself. Bidder SHALL provide <br />the license number for all Subcontractors identified (or the license number for itself, <br />if it has identified itself). If Bidder believes a category of work is not part of the <br />Work, Bidder shall write “NO WORK”. Bidder SHALL submit the information <br />required by this Paragraph 1 with the bid proposal at the published bid <br />submittal time. <br />2. Bidder SHALL identify in the table below the Subcontractors with whom it will <br />subcontract to perform the structural steel installation and rebar installation work. <br />Bidder may identify itself to perform this work. If Bidder believes a category of work <br />is not part of the Work, Bidder shall write “NO WORK”. Bidder SHALL submit the <br />information required by this Paragraph 2 with the bid proposal at the <br />published bid submittal time or within forty-eight hours of the published bid <br />submittal time. <br />3. Bidder shall not list more than one Subcontractor for each category of Work <br />identified, unless Subcontractors vary with Bid alternates, in which case the Bidder <br />must indicate which Subcontractor will be used for which alternate. <br />4. Bidder’s Bid shall be deemed non-responsive and void if: <br />A. If Bidder fails: (1) to submit the names of Subcontractors as required above; <br />(2) to name itself to perform such Work; or (3) to write “No Work”; or <br />B. Bidder names two or more Subcontractors to perform the same category of <br />Work; or <br />C. Bidder fails to provide (or to correct) proof of license as required herein. <br />5. The requirements of this section apply only to Subcontractors who will contract <br />directly with the prime contract bidder submitting the Bid to the City. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.