My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 2 Page 1 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br /> <br /> <br /> <br /> <br /> <br />ADDENDUM NO. 2 TO <br />PORT GARDNER STORAGE FACILITY – <br />FACILITY CONSTRUCTION PACKAGE <br />WO# UP-3525 <br />OCTOBER 8, 2025 <br /> <br />NOTICE TO PLANHOLDERS <br />Addendum No. 2 contains the following revisions, additions, deletions and clarifications <br />and is hereby made a part of the contract documents for the above-named Project and <br />shall be considered by all prospective bidders in submitting bids. <br /> <br />Bidders must acknowledge receipt of Addendum No. 2 in the space provided in section <br />00 41 13 – 1.5 in the Bid Form. Failure to comply with this requirement may render the <br />Bid non-responsive and may cause its rejection. <br /> <br />This Addendum No. 2 consists of two (2) responses to questions received from <br />prospective bidders. This Addendum No. 2 includes all revisions, attachments, and <br />details. <br /> <br /> <br />The Bid date for receipt of Bids is not changed by this Addendum. <br />ANSWERS TO QUESTIONS SUBMITTED FOR CLARIFICATION <br /> <br />Q1 - We have downloaded the contract documents from BXWA, however they are not <br />searchable. Will you be able to provide searchable PDF documents? <br /> <br />Answer - The original, searchable PDF files of the Project plans and specifications may <br />be accessed at the following link. Prospective contractors and interested parties are <br />advised that the PDF copies of the Project plans and specifications provided directly by <br />the City of Everett are for convenience and informational purposes only. The Project <br />plans and specifications hosted by Builder’s Exchange of Washington at <br />www.bxwa.com remain the official contract documents for the Project. <br /> <br />https://www.everettwa.gov/2763/Port-Gardner-Storage-Facility
The URL can be used to link to this page
Your browser does not support the video tag.