My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 12 16 - 1 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />01 12 16 - 1 WORK SEQUENCE <br />SECTION 01 12 16 - WORK SEQUENCE <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This Section specifies project milestones, construction sequencing requirements, work <br />restrictions, and constraints for the Work associated with Port Gardner Storage Facility – <br />Facility Construction Package. <br />B. Refer to EXHIBIT A – SECTION 01 12 16 SITE STORMWATER, DEWATERING & <br />SEWERAGE MANAGEMENT SEQUENCING AND CONSTRAINTS for information <br />related to this Section. <br />1.2 CONTINUITY OF PLANT OPERATIONS <br />A. The existing plant facilities are mostly not active. However, a swale dewatering pump <br />station which discharges East to a sanitary sewer manhole in Lower Norton Avenue, the <br />City material storage, site security lighting, sump pumping of the Area 25 basement, <br />sanitary sewer connecting the Naval Station and Lift Station 6, and other limited power <br />feeds are active and will need to be coordinated and maintained during the construction <br />of this project until no longer necessary by replacement and commissioning of new <br />facilities. <br />B. Lift Station 6 is an active pump station and will be replaced by Area 46 Lift Station 46. <br />The Contractor shall coordinate with the City staff to avoid any interference with City <br />activities. Lift Station 6 flows are tributary to Lift Station 7, which is north of Lift Station 6 <br />and will remain in service throughout and following the Facility Construction Package. <br />C. Maintain or provide temporary power to swale and sump pump equipment identified in <br />this Section and the Drawings. <br />D. Maintain or provide temporary pumping for rainwater entering all basins, including Area <br />30 former aeration basins. Area 30 is currently drained through City installed temporary <br />sump pump in the Area 25 basement. <br />E. A Temporary Power system has been installed under an earlier construction package for <br />use during the Facility Construction Package. This system is described in Attachment I – <br />Temporary Electrical System, Volume 7. At the end of construction, those portions of the <br />Temporary Power system that do not interfere with new Work may be left in place. <br />Coordinate with the Owner for maintenance of previously installed temporary power <br />system during and following construction. <br />F. An existing gravity sanitary sewer main serving the adjacent Naval Facility passes <br />through the site from west to east in the vicinity of proposed Lift Station 46. This main <br />will be re-routed and incorporated into the new facilities as shown on the Drawings. <br />Sewage flow in this main are estimated to be 15 gallons per minute and must not be <br />interrupted until the re-routed main and downstream facilities, including Lift Station 46, <br />are completed, operational, commissioned and accepted by the City. Refer to EXHIBIT <br />A – SECTION 01 12 16 for further information related to sewerage management during <br />construction.
The URL can be used to link to this page
Your browser does not support the video tag.