My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 12 16 - 5 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />01 12 16 - 5 WORK SEQUENCE <br />d. Archaeological monitoring will be paid for by the Owner. <br />e. If any Contractor or Subcontractor believes that they have found cultural <br />resources or human remains at any point in the project, all work must stop <br />immediately in the vicinity of the discovery. <br />f. See Volume 7, Attachment L Archaeological Resources Monitoring and <br />Inadvertent Discovery Plan, for additional information detailing archaeological <br />monitoring requirements and actions that must be taken in the instance that a <br />discovery is identified during construction. <br />4. Positive location and elevation of existing pipes to be crossed by proposed pipes <br />and/or duct banks shall be confirmed prior to installation of the proposed pipes or <br />duct banks crossing existing pipes. Minimum locations to confirm existing pipe <br />location and depth are shown on the Drawings. <br />5. All existing pipes to be connected to shall be excavated to confirm location and <br />elevation prior to preparing piping lay drawings. In those instances where piping <br />laying drawings are prepared prior to discovery, pipeline construction techniques <br />shall anticipate makeup pieces and connection appurtenances that may be <br />necessary for differing site conditions. <br />6. The connection to the existing water main within Lower Norton Avenue in the north <br />(near Area 46) shall be hot tapped. The connection to the existing water main in the <br />south (near Area 25) shall be utilize an existing tee with isolation valve. Both <br />connections shall be made in coordination with and guided by the City. Contractor <br />shall coordinate with the City Water Department on requirements. <br />7. All construction and related activities must adhere to restrictions and clearances <br />related to the project boundary shared with the Everett Naval Station shown on <br />Drawing C-00-0002. Vehicles and machinery are permitted within the clearance <br />area, but cannot be left within the clearance area when active construction is not in <br />process, including overnight. Specific requests for activities within the 50-foot <br />clearance area shall be coordinated directly with the Owner.
The URL can be used to link to this page
Your browser does not support the video tag.