Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 12 16 - 6 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />01 12 16 - 6 WORK SEQUENCE <br />8. Existing Swale Pump Station <br />a. The Contractor is advised that there is a functioning pump station on site just <br />south of Area 35 (the former clarifier). This is called the “Swale Pump Station”. <br />The Contractor is advised that this pump station is in service to handle <br />stormwater flows from the existing storm drainage from the PGSF site and <br />must stay in operation until site storm drainage is managed by the proposed <br />facilities or the contractor substitutes this system with an alternative system <br />provided by the Contractor at no additional cost to the City. The system pumps <br />stormwater east through an existing conveyance pipe atop an ecology block <br />wall along the south property line. This pipe discharges into a sanitary sewer <br />manhole near the southeast property corner and thence flows north through <br />existing sanitary mains to Lift Station 6. The stormwater effluent is then <br />conveyed north by Lift Station 6 to Lift Station 7 as combined sewage. The <br />Contractor shall be prepared to re-arrange discharge piping to other existing <br />sewer manholes as necessary to permit construction and installation as <br />required by the contract documents. This sanitary sewer east of the PGSF <br />property will be demolished as part of the WMVD project in the Summer of <br />2026. Alternative means of discharge piping shall be submitted to the City for <br />approval during construction when the piping must change as construction <br />progresses. <br />b. Power for the Swale Pump Station is currently fed from a power pole located <br />in the southeast corner of the site. This power supply is to be replaced and <br />rerouted to the Swale Pump Station from a temporary panel at the northwest <br />corner of Area 30. When transition of the source of power is necessary, power <br />to the Swale Pump Station must not be interrupted. Contractor shall be <br />responsible for the operation of the Swale Pump Station during construction. <br />See Temporary Construction Power Site Plans in Volume 7 Attachment I for <br />more detail of current temporary power arrangement. <br />c. Once the on-site storm sewer construction activities are complete, site paving <br />is complete, Lift Station 46 is complete and commissioned, and all other <br />construction dewatering activities have been completed, the Swale Pump <br />Station can be demolished. Swale pump station pumps and controls shall be <br />salvaged to the Owner. <br />9. Stormwater Conveyance During Construction <br />a. Existing stormwater is conveyed by the Swale Pump Station to Lift Station 6 to <br />be treated as combined sewage. Conveyance of stormwater to Lift Station 6 <br />and/or Lift Station 7 is to remain during construction until Lift Station 46 is <br />commissioned and able to fully replace Lift Station 6. Stormwater runoff must <br />not leave the site other than by conveyance to existing or proposed sanitary <br />sewer systems and per any limitations and requirement of the Stormwater <br />NPDES General Permit for the project.
The URL can be used to link to this page
Your browser does not support the video tag.