My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 12 16 - 8 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br /> <br /> <br />01 12 16 - 8 WORK SEQUENCE <br />14. West Marine View Drive Conveyance Project (WMVD): <br />a. This Storage Facility Construction Package includes installation of capped <br />pipelines that terminate near the project boundary along Lower Norton Avenue <br />on the eastern boundary of the project site. The ends of these pipes will <br />connect with newly installed conveyance lines constructed under a separate <br />concurrent contract - the West Marine View Drive Conveyance project, <br />Construction Package 2 (WMVD). The Contractor shall coordinate with the <br />Owner and WMVD contractor to avoid potential conflicts with construction <br />along Lower Norton Avenue, share use of staging areas outside of the PGSF <br />property boundaries and as needed within PGSF property boundaries for <br />making said pipeline connections by WMVD Construction Package 2, and <br />ensure access to both the PGSF and WMVD project sites. <br />b. Schedule: <br />1) Drawing C-10-1303: <br />a) As identified on the drawing, Contractor shall complete and provide <br />access to the pipe connection points under Keynote #17 for the <br />WMVD Construction Package 2 project contractor no later than <br />August 1st, 2026. Following installation of the connection points <br />included in the PGSF Contract, the PGSF Contractor shall pause <br />work in this area to accommodate construction of the WMVD <br />Construction Package 2 pipelines that will join to these connection <br />points. <br />The WMVD Package 2 contractor will complete the pipe connections, <br />backfill the connection points and WMVD piping and improve the area <br />to provide a drivable surface on Lower Norton Ave east of the <br />property lines indicated on Drawing C-10-1303 and as generally <br />indicated in Specification 01 12 16 Exhibit A-4.2, tiles C-2109, C-2209 <br />and C-2309 no later than December 31, 2026. Final site restoration <br />within the scope of WMVD Package 2, including curbing, pavement, <br />and other finish work is anticipated to be completed towards the end <br />of the WMVD project in the 3rd and 4th quarters of 2027. <br />From August 1st, 2026 – December 31, 2026 assume access to the <br />PGSF site from the Marine View Drive southbound offramp and to <br />northeast of the PGSF site through access gates noted on Drawing C- <br />00-0002, Keynote #8. <br />Following completion of the WMVD Contract 2 work, complete the <br />outstanding work along the eastern project boundary that was paused <br />to accommodate WMVD Construction Package 2. This outstanding <br />work may include items such as permanent power, shallow utilities, <br />pavement, lighting, and fencing. <br />The exact extent of the pause work area and the necessary <br />sequencing during this pause work period shall be coordinated with <br />the Owner and Owner’s Representative and reflected in the baseline <br />Progress Schedule with refinement with Progress Schedule updates <br />as coordination continues between the Owner and concurrent WMVD <br />contracts and WMVD Contract 2 schedule is developed and made <br />known. <br />
The URL can be used to link to this page
Your browser does not support the video tag.