Laserfiche WebLink
Addendum 1 Page 4 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />The Bidder agrees that the City shall not be liable to it on any claim for <br />additional payment or additional time or any claim whatsoever if the claim <br />directly or indirectly results from the Bidder’s failure to investigate and <br />familiarize itself sufficiently with the conditions under which the Contract is to <br />be performed. <br />The Bidder shall be familiar and comply with all Federal, State, tribal, and local <br />laws, ordinances, and regulations which might affect those engaged in the <br />Work. The City will not consider any plea of misunderstanding or ignorance of <br />such requirements. <br />Bid prices shall include everything necessary for the completion of the Work <br />including, but not limited to, providing the materials, equipment, tools, plant and <br />other facilities, and the management, superintendence, labor, and all <br />necessary testing services. <br />The Bidder acknowledges and agrees that its Bid is based on its evaluation of <br />market conditions as of the date for Bid submission. The Bidder further <br />acknowledges and agrees that the City shall not be liable for any claim for <br />additional payment or additional time or any claim whatsoever for general price <br />escalation, tariffs, inflation, market fluctuations, or increases in the cost of labor, <br />materials, equipment, supplies or services occurring after the date for Bid <br />submission, and expressly waives any and all claims based on such price <br />escalation. <br />Prospective Bidders are advised that projects with Work on or adjacent to water <br />may require insurance coverage in compliance with: <br />1. The Longshoremen’s and Harbor Worker’s Compensation Act <br />(administered by U.S. Department of Labor), or <br />2. The State Industrial Insurance (administrated by the Washington State <br />Department of Labor and Industries), or <br />3. Both. <br />The Contractor shall bear all cost for such insurance as provided in the Contract <br />Documents. <br />No Claim shall be allowed because of any ambiguity in the Contract if: <br />1. The Bidder discovers an ambiguity but fails to notify the City, or <br />2. The Bidder failed to discover a patent ambiguity that would be discovered <br />by a reasonably prudent contractor in preparing its Bid. <br />Any prospective Bidder desiring an explanation or interpretation of the Bid <br />Documents, shall request the explanation or interpretation in writing by close <br />of business seven business days preceding the Bid opening to allow a written <br />reply to reach all prospective Bidders before the submission of their Bids. <br />Bidder acknowledges that the Bidder has not relied on representation or <br />warranty of the City not expressly included in the Contract Documents.