Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 4 Page 4 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Item 10 - VOLUME 7 ATTACHMENTS: <br />Add the following new attachment to Volume 7 Attachments: <br />ATTACHMENT O: BIDDER QUESTIONS AND RESPONSES FROM FIRST <br />BID PERIOD <br />Attachment O incorporates in the bid record responses to bidder questions <br />from the first bid period that remain valid for the current bid period ending <br />October 21, 2025. <br />ANSWERS TO QUESTIONS SUBMITTED FOR CLARIFICATION <br /> <br />Q1 - Can you please verify that the new crane span in addendum 1 is correct? <br />See Specifications, Plans, and Contract Documents updates to Item 8 above. <br />Q2 - The plans, specifications, and geotechnical report make reference to various <br />design standards (IBC, FHWA, and AASHTO). Please clarify which standard should be <br />used for micropile design and testing. <br />See Attachment O, Question 136. <br />Q3 - In the May 2025 geotechnical report, required ultimate axial loads are provided for <br />static loading (90-kips), seismic loading (55-kips), and downdrag loading (ranging from <br />5-kips to 20-kips) . Please confirm that the static and downdrag loads should be added <br />and act in compression. Please confirm that the seismic loads act in tension. <br />See Attachment O, Question 137. <br />Q4 - Can you confirm all micropiles are required to meet the same axial, seismic and <br />downdrag loads listed in the project geotech report Table 2? <br />See Attachment O, Question 138. <br />Q5 - Can we perform verification tests on a production micropile or do we have to install <br />a sacrificial micropile for each verification test? <br />See Attachment O, Question 139. <br />Q6 - The geotechnical report provides ultimate micropile loads that were determined <br />using AASHTO LRFD Bridge Design Specifications. The project specifications provide <br />micropile testing criteria based on FHWA allowable loads. Please confirm that the loads <br />provided in the geotechnical report have been factored and provide testing criteria for <br />factored design load, or, please provide allowable design micropile loads for design and <br />use with the FHWA testing criteria included in the project specifications. <br />See Attachment O, Question 140.