My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 4 Page 5 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Q7 - Please confirm micropile loading is axial only and no lateral or bending loading will <br />be considered. <br />See Attachment O, Question 141. <br />Q8 - The project specifications state that total vertical movement should be less than ½” <br />at 1.0DL. Micropiles may deflect 1-inch or more when load testing to 1.0DL. Please <br />confirm this is acceptable. <br />See Attachment O, Question 142. <br />Q9 - Please confirm that all micropile load testing can be performed in tension to the <br />maximum design load per pile. <br />A minimum of one compression test is required for proof testing per <br />Specification Section 31 63 33 3.03.B.2. <br />Q10 - Please confirm Gr150 threadbar can be used for micropile threadbar. <br />See Attachment O, Question 143. <br />Q11 - Please confirm mill secondary micropile casing can be used for micropile casing. <br />See Attachment O, Question 144. <br />Q12 - Please confirm Type 1L cement can be used to prepare micropile neat cement <br />grout due to local availability. <br />See Attachment O, Question 145. <br />Q13 - Standard detail for Manhole Pile Supports C82001P calls out 9-micropiles while <br />the table on Sheet S-00-0005 only lists 8-micropiles at CSMH-15-01 and CSMH-15-02 <br />each. <br />See Attachment O, Question 146. <br />Q14 - Plans refer the August 2024 geo report while there is an updated report provided <br />from May 2025. Confirming the May 2025 report shall be used for all micropile design? <br />See Specifications, Plans, and Contract Documents updates Items 4, 6, and 7 <br />above. <br />Q15 - Does all the design information from the project’s July 2025 RFP (including all <br />Q&A and Addenda 1-8) apply to this current re-bid? <br />Questions from the July 2025 bid period have been provided for reference in new <br />Attachment O. See Specifications, Plans, and Contract Documents updates Item <br />10 above.
The URL can be used to link to this page
Your browser does not support the video tag.