My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 4 Page 6 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Q16 - Bid items #26-27 indicate a quantity of 2,250-LF for the micropiles even though <br />the contractor has to design the lengths to meet the design loads and test micropiles <br />accordingly. Since the lengths will differ from the bid item, can this be changed to a <br />lump sum bid item instead? <br />Bid Items 26 and 27 will not be revised to Lump Sum. Actual lengths determined <br />through Contractor’s design and as accepted by the Engineer will be paid on a <br />unit price basis. <br />Q17 - Please see the attached substitution request form for Distech products to be used <br />in section 23 09 00. <br />Any other submitted manufacturers to be considered as “or equals” when <br />allowed under the specifications, and those for which a substitution request is <br />made, will need to follow the substitution procedures provided in Section 00 72 <br />00 General Conditions and Section 01 25 00 Substitution Procedures. Or equal <br />determinations and substitutions requests will be considered after contract <br />award and will not be considered during the bid period per Section 01 25 00, <br />Paragraphs 1.6.B and 1.7.C. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.