My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 5 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Q17 - Specification 31 32 33 | Article 2.01.A – Is Type 1L cement acceptable for <br />DSM/Jet-Grout Construction? <br />Yes. Type 1L should conform to Section 9-01.2(1)B of the 2025 WSDOT Standard <br />Specifications. Contractor must confirm that Type 1L grout mix meets testing <br />and performance criteria. <br />Q18 – Specification 31 32 33 | Article 2.01.A – Due to presence of organics, we must <br />use slag in combination with cement. Note that Cement-Slag provides higher strength <br />than cement only mixes. Is slag utilization acceptable? <br />Yes. Contractor must confirm that cement-slag mixture will achieve specified <br />strengths. <br />Q19 – Specification 31 32 33 | Article 3.02 – It is impossible to extract wet grab samples <br />from jet grout columns. Will sample collection from spoils reflow at the surface while the <br />nozzle is at top, middle and bottom 1/3 of the column be acceptable? If not, what other <br />alternate approach does the Engineer suggest for quality assurance? <br />Three wet grout-soil mix samples (downhole sampling) shall be obtained from the <br />in-situ soil cement column during installation at each of the following depths in <br />the column: top one third, middle one third, bottom one third. For jet grouting, <br />sample collection from spoils reflow (i.e., backflow) at the surface may be taken <br />in lieu of downhole sampling. Sampling from spoils reflow should be taken while <br />the nozzle is at each of the following depths in the column: top one third, middle <br />one third, bottom one third. <br />Q20 – Can you provide the raw Cone Penetration Test (CPT) files? <br />A copy of the CPT files may be accessed at the following link: <br />https://www.everettwa.gov/DocumentCenter/Index/1867 <br />Q21 – Can you provide the RocScience Slide files in the geotechnical report? These <br />files are needed for the Contractor’s preliminary design of ground improvement. <br />No. The material input properties used for HWA’s stability analyses of existing <br />site conditions are provided in the geotechnical report. The contractor could use <br />those soil properties to generate their own stability models to evaluate their <br />preliminary design of the ground improvement buttress. <br />Q22 – With reference to spec section 00 21 13, 1-02.1(1), please confirm it is <br />acceptable for Bidder to use qualified subcontractors to meet requirements of 1. with <br />respect to having a plumbing contractor’s license, an elevator contractor’s license, and <br />an electrical contractor’s license in compliance with the appropriate RCW. <br />Subcontractor licenses do not satisfy this requirement for bidder’s responsibility <br />determination under RCW 39.04.350.
The URL can be used to link to this page
Your browser does not support the video tag.