Laserfiche WebLink
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 5 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Q17 - Specification 31 32 33 | Article 2.01.A – Is Type 1L cement acceptable for <br />DSM/Jet-Grout Construction? <br />Yes. Type 1L should conform to Section 9-01.2(1)B of the 2025 WSDOT Standard <br />Specifications. Contractor must confirm that Type 1L grout mix meets testing <br />and performance criteria. <br />Q18 – Specification 31 32 33 | Article 2.01.A – Due to presence of organics, we must <br />use slag in combination with cement. Note that Cement-Slag provides higher strength <br />than cement only mixes. Is slag utilization acceptable? <br />Yes. Contractor must confirm that cement-slag mixture will achieve specified <br />strengths. <br />Q19 – Specification 31 32 33 | Article 3.02 – It is impossible to extract wet grab samples <br />from jet grout columns. Will sample collection from spoils reflow at the surface while the <br />nozzle is at top, middle and bottom 1/3 of the column be acceptable? If not, what other <br />alternate approach does the Engineer suggest for quality assurance? <br />Three wet grout-soil mix samples (downhole sampling) shall be obtained from the <br />in-situ soil cement column during installation at each of the following depths in <br />the column: top one third, middle one third, bottom one third. For jet grouting, <br />sample collection from spoils reflow (i.e., backflow) at the surface may be taken <br />in lieu of downhole sampling. Sampling from spoils reflow should be taken while <br />the nozzle is at each of the following depths in the column: top one third, middle <br />one third, bottom one third. <br />Q20 – Can you provide the raw Cone Penetration Test (CPT) files? <br />A copy of the CPT files may be accessed at the following link: <br />https://www.everettwa.gov/DocumentCenter/Index/1867 <br />Q21 – Can you provide the RocScience Slide files in the geotechnical report? These <br />files are needed for the Contractor’s preliminary design of ground improvement. <br />No. The material input properties used for HWA’s stability analyses of existing <br />site conditions are provided in the geotechnical report. The contractor could use <br />those soil properties to generate their own stability models to evaluate their <br />preliminary design of the ground improvement buttress. <br />Q22 – With reference to spec section 00 21 13, 1-02.1(1), please confirm it is <br />acceptable for Bidder to use qualified subcontractors to meet requirements of 1. with <br />respect to having a plumbing contractor’s license, an elevator contractor’s license, and <br />an electrical contractor’s license in compliance with the appropriate RCW. <br />Subcontractor licenses do not satisfy this requirement for bidder’s responsibility <br />determination under RCW 39.04.350.