Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 11 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Per 00 21 13 1-02.4 the bidder agrees that the City shall not be liable to it on any <br />claim for additional payment or additional time or any claim whatsoever if the <br />claim directly or indirectly results from the bidders failure to investigate and <br />familiarize itself sufficiently with the conditions under which the Contract is to be <br />performed. <br />Q52 - Dwg S-70-1002 (Sht 302) @ gridline E/2 indicates “Infill existing opening per <br />D/S70-3010. Typ 3 places.” Detail D/S70-3010 is a detail for a masonry infill. The <br />specs do not currently include anything in Div 4. Please provide the appropriate <br />masonry specs as required for this work. <br />See Drawings S-00-0001 and S-00-0004 for masonry specifications. <br />Q53 - Please reference drawing C-00-0002. It's noted on multiple drawings including <br />drawing C-00-0002 that no bulk material storage or equipment storage will be permitted <br />within the naval station security setback. Multiple underground pipelines need to be <br />installed within this setback. Please advise if machinery, bulk materials, shoring, and <br />other materials actively being used in construction of these pipelines can be left within <br />the setback overnight while the work is ongoing. <br />Per Drawing C-00-0002 and Security Procedures Section 01 35 53, 1.4.A.1, the <br />buffer zone cannot be used for parking, laydown, storage, or any other permanent <br />construction related activities. Per Work Sequence Section 01 12 16, 1.7.B.7, <br />specific requests for activities within the 50-foot clearance area shall be <br />coordinated directly with the Owner. <br />Q54 - With reference to 01 22 13-3 1.8 A. Part 1 limits mobilization price to 5% of the <br />total of all bid items. Part 2 requires 5% of the original Contract amount to be earned <br />from other bid items before payment of 50% of the mobilization amount. Under this <br />payment regime, with a bid price of $100,000,000 the successful bidder will incur all <br />mobilization costs, and an additional $5,000,000 in contract item costs before being <br />eligible for payment for mobilization. It is not reasonable for a contractor to spend up to <br />$7,500,000 out of pocket before receiving payment. Please change Mobilization <br />payment to 75% of the bid price payable upon contract signing to allow the contractor <br />sufficient working capital to mobilize the project. <br />The City declines to revise specification Section 01 22 13, 1.8.A <br />Q55 - Standard Detail C43002C (Catch Basin 2) provides for diameters 48”-94”. CB-6, <br />-7, -8, -22, -32, -33, -38 do not appear to have diameter callouts attached to them. <br />Please provide this information for each. <br />Type II 48”: CB-60, -7 -8, -22, -32, -33 <br />Type II 54”: CB-38