Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 12 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Q56 - Specification 02 41 00 3.04 DEMOLITION A states “The contractor shall be <br />responsible for determining the scope and extent of the required work by inspecting the <br />site prior to submittal of bid.” Please confirm that if demolition beyond the limits shown <br />in the drawings is required to construct the Work, Article 6 CHANGES will apply for <br />compensation. <br />The linear demolitions shown in the drawings do not have finite limits. For <br />example, the end of pipe and/or duct bank, buried electrical lines, etc. are <br />approximate and may have to be extended to permit installation of new facilities. <br />This is noted in General Note 8 on Drawing CX-10-2002, CX-10-2003, and CX-10- <br />2004. Further, paragraph 3.04.E of the specification in question also notes the <br />necessity to remove piping and duct bank from areas indicated on the drawings <br />and as necessary to install new facilities. Hence, demolition beyond the linear <br />limits do not fall under Article 6 Changes. In addition, per Specification 02 41 00 <br />3.04, paragraph 3.04.C states that the drawings define minimum portions of <br />facilities and structures to be removed. Therefore, if some additional <br />demolition/removal is needed to install new facilities, it would not fall under <br />Article 6 Changes. <br />Also, if existing buried structures, piping, duct bank, electrical conduit and cables <br />not shown on record drawings are discovered during construction that differ <br />materially from the drawings and specifications, this may be addressed under <br />General Conditions Article 11 Differing Site Conditions. <br />Q57 - Drawing CD-10-7001, Detail L, indicates a 36”x36” hatch for the precast utility <br />vault. Note 1 says the assembly will be installed in a non-traffic area. Shall it conform <br />to Specification 08 31 20 and are they (2 each) any of the ones listed in the Floor <br />Access Door Schedule in Section 3.06? <br />The 36”X36” hatches are not included in the Section 3.06 table. The hatch per <br />detail L should be load rated 300 psf minimum, as specified in Section 08 31 20. <br />Q58 - Drawings C-10-1203 and C-10-6201 show SWVT 46-06 in plan and profile <br />respectively, but no apparent reference to construction details (precast or CIP). Please <br />provide. <br />SWVT 46-06 is a packaged pump station that shall meet Specification 33 32 16. <br />Q59 - Please reference drawing D-40-1001. Drawing D-40-1001 shows a 6” SW line <br />connecting to an existing concrete box. No penetration details are listed. Please advise <br />if the penetration already exists or if one should be included in this bid. If so, please <br />provide the penetration detail type. <br />There is an existing penetration from the concrete box to connect the new 6" SW. <br />No new penetration is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.