My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 13 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />Q60 - Drawing CX-10-2001 indicates approximate extents of existing asphalt pavement <br />to be demolished, not including electrical conduit trench removal. The Geotechnical <br />Engineering Report indicates most of the AC thickness to be 4” thick, with no apparent <br />rock/ base underlayment. HWA-2 indicates AC thickness at 6”. For bidding purposes, <br />please define the section (AC/ Base) to be removed/ disposed of and how much of the <br />area is 6” thick versus the 4” thick balance. <br /> <br />Based on available information, the thickness of AC across the site ranges from <br />3” to 6” but is predominantly an average thickness between 4” and 5”. <br /> <br />Q61 - Drawing G-00-0021 provides a Legend for areas defined on this drawing. The <br />“Site”, Area 10 does not appear to be defined. Please provide an outline of this Area 10 <br />as it relates to Bid Item #6 1.a. <br />As noted in the legend provide on Drawing G-00-0021, the Area 10 site is defined <br />by the white area shown within the project property boundary and purple for the <br />instance of Lift Station 6. For grading see Drawings C-10-1201 through C-10-1206. <br />For resurfacing improvements, access roads, parking areas, site asphalt paving, <br />striping, and bollards see Site Improvements Drawings C-10-1101 through C-10- <br />1105. For Area 10 lighting see Drawing EL-10-1001. <br />Q62 - Drawing GX-10-3001 indicates structural concrete to be demolished. After <br />gutting the station, the void is to be backfilled with structural fill. Can the top two feet <br />and deck concrete be a part of the structural fill? <br />As required by Specification Section 02 41 19, 1.03, “Demolish” shall mean <br />“Detach items from existing construction and dispose of them off-site unless <br />indicated to be salvaged or reinstalled.” Top two feet and deck of LS6 may not be <br />used as a part of the structural fill. <br />Q63 - Drawing CX-10-2005, Keynote 1 says to demolish Storm Manhole. What is the <br />diameter of this manhole? <br />Unknown, there are no records on the diameter of the existing storm manhole. <br />Q64 - Drawing CX-10-2003, Keynote 1 calls for the demolition of a Grated Vault. <br />Volume 7, Attachment A, Drawing B-9017 says to refer to Drawing B-9757 for possible <br />information on this Grated Vault. Drawing B-9757 is not a part of this attachment. <br />Please provide Drawing B-9757, and any other details, that provide information on this <br />Grated Vault to be demolished. What is the makeup of this sludge that needs to be <br />sucked out? This is needed to determine proper disposal. <br />All available as-built documentation is provided in Volume 7 Attachment A. Any <br />missing drawings are unavailable. Makeup of sludge that needs to be removed is <br />hardened material exceeding 20% solids that likely will require some jetting prior <br />to suctioning. See Specification Section 02 61 00 for handling requirements.
The URL can be used to link to this page
Your browser does not support the video tag.