My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025 (3)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 4:01:59 PM
Creation date
12/9/2025 3:59:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Addenda
Tracking Number
0005035
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 17 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />The City will not revise the submittals provision (00 72 00-2.4). The City will not <br />revise the owner’s representative provision (00 72 00-3.2). <br />Q79 - Section 00 11 13, Washington State Department of Ecology Stormwater Facility <br />Specification Insert, “Inadvertent Discovery of Archeological Resources – Please <br />confirm if impacts to Work on account of discovery of archeological resources is an <br />event to which GC 11 applies, or otherwise confirm that such impacts will entitle the <br />Contractor to adjustments to the Contract Time and Contract Sum. <br />Discovery of pre-existing subsurface conditions, including archaeological <br />resources, is governed by the provisions and requirements of General Conditions <br />00 72 00-11 (Differing Site Conditions). <br />Q80 - Please include Contractor recourse for Owner defaults, including for payment, <br />including a right for Contractor to suspend Work in the event of Owner’s failure to pay <br />undisputed amounts. <br />The City declines to include the requested revision. <br />Q81 - Please include an aggregate cap on liability in amount equal to 50% of the <br />Contract Sum. Please also include a subcap for delay liability (including for liquidated <br />damages) in an amount equal to 5% of the Contract Sum. <br />The City declines to include the requested revision. <br />Q82 - Please include a mutual waiver of consequential damages. <br />The City declines to include the requested revision. <br />Q83 - Drawings S-25-1001 note 1 states to identify cracks and repair the affected area. <br />Is this work paid under bid item 30? <br />Yes, concrete repair directed in Keynote 1 on Drawing S-25-1001 is to be covered <br />by Force Account Bid Item 30 Allowance For Concrete Repairs. <br />Q84 - Section 00 22 13 Supplemental Instructions to Bidder 1.2.C references <br />Performance Based Mitigation Measures for Settlement. Please clarify what is required <br />to be submitted with the bid. <br />Refer to Section 00 21 13 OTHER MATTERS, Bidder’s Checklist, for requirements <br />for the Submission with the Bid. <br />Q85 - Louver schedule for OMES Building: Sheet A-70-5001 has 5 louvers and Sheet <br />M-70-7001 has 3 louvers. Confirm that there are 3 louvers and 3 exhaust fans in the <br />OMES building, and details 4,8,12/A-70-3005 apply to all these openings. <br />Confirmed, there are 3 (intake) louvers and 3 exhaust louvers per Drawing M-70- <br />7001. Details 4. 8 &12 on Drawing A-70-3005 apply to these openings.
The URL can be used to link to this page
Your browser does not support the video tag.