Laserfiche WebLink
Port Gardner Storage Facility Volume 7 Attachment O <br /> Page 17 <br />CITY OF EVERETT ⋅ 3200 Cedar Street ⋅ Everett, WA 98201 ⋅ (425) 257-8800 ⋅ Fax (425) 257-8882 <br /> <br />The City will not revise the submittals provision (00 72 00-2.4). The City will not <br />revise the owner’s representative provision (00 72 00-3.2). <br />Q79 - Section 00 11 13, Washington State Department of Ecology Stormwater Facility <br />Specification Insert, “Inadvertent Discovery of Archeological Resources – Please <br />confirm if impacts to Work on account of discovery of archeological resources is an <br />event to which GC 11 applies, or otherwise confirm that such impacts will entitle the <br />Contractor to adjustments to the Contract Time and Contract Sum. <br />Discovery of pre-existing subsurface conditions, including archaeological <br />resources, is governed by the provisions and requirements of General Conditions <br />00 72 00-11 (Differing Site Conditions). <br />Q80 - Please include Contractor recourse for Owner defaults, including for payment, <br />including a right for Contractor to suspend Work in the event of Owner’s failure to pay <br />undisputed amounts. <br />The City declines to include the requested revision. <br />Q81 - Please include an aggregate cap on liability in amount equal to 50% of the <br />Contract Sum. Please also include a subcap for delay liability (including for liquidated <br />damages) in an amount equal to 5% of the Contract Sum. <br />The City declines to include the requested revision. <br />Q82 - Please include a mutual waiver of consequential damages. <br />The City declines to include the requested revision. <br />Q83 - Drawings S-25-1001 note 1 states to identify cracks and repair the affected area. <br />Is this work paid under bid item 30? <br />Yes, concrete repair directed in Keynote 1 on Drawing S-25-1001 is to be covered <br />by Force Account Bid Item 30 Allowance For Concrete Repairs. <br />Q84 - Section 00 22 13 Supplemental Instructions to Bidder 1.2.C references <br />Performance Based Mitigation Measures for Settlement. Please clarify what is required <br />to be submitted with the bid. <br />Refer to Section 00 21 13 OTHER MATTERS, Bidder’s Checklist, for requirements <br />for the Submission with the Bid. <br />Q85 - Louver schedule for OMES Building: Sheet A-70-5001 has 5 louvers and Sheet <br />M-70-7001 has 3 louvers. Confirm that there are 3 louvers and 3 exhaust fans in the <br />OMES building, and details 4,8,12/A-70-3005 apply to all these openings. <br />Confirmed, there are 3 (intake) louvers and 3 exhaust louvers per Drawing M-70- <br />7001. Details 4. 8 &12 on Drawing A-70-3005 apply to these openings.